1 |
FRM |
Regional Models Updating and Validation for 2025 |
IWM |
2025 - 2026 |
National |
On Going |
2 |
IGW |
Exploration of Conjunctive Use of Surface Water and Groundwater Resources through Mathematical Modelling for Barind Region of Bangladesh |
N/A |
2025 - 2026 |
National |
On Going |
3 |
CPI |
Development & Implement a Machine Learning- Based River Salinity Model in Bangladesh, Focusing on Three polder Systems |
International Rice Research Institute |
2025 - 2025 |
National |
On Going |
4 |
RME |
Feasibility Study and Preliminary Design of Paotana-Ulipur Bridge on Paotana Ulipur Connecting Road (Paotana GC Ulipur UHQ via Paniyal Ghat Road at Ch. 2200m, Road ID: 185732011 under Upazila: Pirgacha, District: Rangpur |
Local Government Engineering Department |
2025 - 2026 |
National |
On Going |
5 |
SDT |
Natural Conditions Survey during Rainy Season for the Consulting Services for Matarbari Port Development Project (Basin Area Survey) in Bangladesh |
Nippon Koei |
2025 - 2025 |
National |
On Going |
6 |
CPI |
Supervision and Monitoring the Capital & Maintenance of Dredging, Morphological and Environmental Impacts, Detailed Design and Assessment of Effectiveness of Dredging for Restoration of Dry Season Flow, Erosion Management and Navigation Improvement of Ghagot and Nagda River |
Bangladesh Army |
2025 - 2028 |
National |
On Going |
7 |
ICT |
River water quality monitoring and database management system establishment in Dhaka, Bangladesh |
|
2025 - 2026 |
National |
On Going |
8 |
ICT |
Potential Applications of LiDAR and Photogrammetric Data in Agriculture and other fields through Prototype Development |
FAO |
2025 - 2025 |
National |
On Going |
9 |
SPB |
Strategic Environmental Assessment on the Project for the Formulation of MIDI Master Plan in Bangladesh |
Nippon Koei |
2025 - 2028 |
National |
On Going |
10 |
SDT |
Pre Survey Early Stage and Internal Marine Survey” at Matarbari area |
|
2025 - 2025 |
National |
On Going |
11 |
SDT |
Bathymetric Survey for Precautionary bank protection work of Little Feni River at Muchapur area of Companiganj upazila in Noakhali district |
Bangladesh Army |
2025 - 2025 |
National |
On Going |
12 |
WSU |
Strengthening SMEs' Capacities to Combat Pollution |
|
2025 - 2026 |
National |
On Going |
13 |
SDT |
Support Services for Implementation of Survey works in connection with Different Ongoing Projects of Bangladesh Water Development Board during the year of 2025-2026 |
Bangladesh Water Development Board |
2025 - 2026 |
National |
On Going |
14 |
WSU |
Review of Sewer Network Model and Hydraulic Design under DSIP |
Consultancy Service |
2025 - 2027 |
National |
On Going |
15 |
IGW |
Hydrological Investigation & Modelling of the State of Surface and Groundwater Resources in the North-Central Hydrological Regions of Bangladesh |
WARPO |
2025 - 2026 |
National |
On Going |
16 |
RME |
Climate Adaptation & Resilience Interventions for the WB Climate Smart Rural Transport (CSmaRT) Project |
|
2025 - 2026 |
National |
On Going |
17 |
FRM |
Survey of Climate Condition under the Preparatory Survey of Haor Area Resilience and Development Project (Phase 2) |
Dhaka |
2025 - 2025 |
National |
Completed |
18 |
RME |
Hydrology-morphology study to determine the need for construction of new bridge/culvert or widening of existing bridge/culvert in order to maintain natural flow of water on both sides of Itna-Mithamain-Asthagram Road (Z-3611) under Kishoreganj Road Division |
Good |
2025 - 2026 |
National |
On Going |
19 |
ICT |
Development of River Pollution Monitoring System (RPMS) |
WARPO |
2025 - 2026 |
National |
On Going |
20 |
RID |
To Explore the Impact of Hydrological Regime Changes and Connectivity Loss on the Selected Waterbodies in the North-East Hydrological Region of Bangladesh. |
WARPO |
2025 - 2026 |
National |
On Going |
21 |
IGW |
Consulting Services for Feasibility Study of Proposed “Cumilla-Chandpur-Brahmanbaria District Irrigation Area Development Project (2nd Phase)” |
Bangladesh Water Development Board |
2025 - 2025 |
National |
On Going |
22 |
CPI |
Detailed Feasibility Study for Integrated Development of Selected Stable Chars in the Meghna Estuary for Implementation under CDSP V and Erosion Management Plan at Boyer Char, Char Nangulia and Noler Char |
Bangladesh Water Development Board |
2025 - 2026 |
National |
On Going |
23 |
SDT |
Pre-work and Post-work Measurement of Ponds and Canals under ECCCP-Drought, Palli Karma-Sahayak Foundation (PKSF). Client: Palli Karma-Sahayak Foundation (PKSF). |
|
2025 - 2026 |
National |
On Going |
24 |
IGW |
Consultancy Service for “Initial Environmental Examination (IEE) Study for the Five Selected Projects of BADC |
Bangladesh Agriculture Development Corporation |
2025 - 2025 |
National |
Completed |
25 |
FRM |
1D Hydraulic Analysis for the Preparatory Survey on Haor Area Resilience and Development Project in Bangladesh (Phase-2) |
Nippon Koei |
2025 - 2025 |
National |
Completed |
26 |
WSU |
Design Review and Construction Supervision (Package No. SD-1) |
Dhaka Water Supply and Sewerage Authority |
2025 - 2028 |
National |
On Going |
27 |
WSU |
Establishment of Sewerage System in Chattogram Metropolitan (Phase I) |
Chittagong WASA |
2025 - 2027 |
National |
On Going |
28 |
SDT |
Consultancy services for land acquisition in connection with construction of Pubail-Dhirasram rail link including land acquisition for construction of Dhirasram ICD project of Bangladesh Railway |
Bangladesh Railway |
2025 - 2026 |
National |
On Going |
29 |
CPI |
Consultancy Services for Supervision and Monitoring the Capital & Maintenance of Dredging, Morphological, Detailed Design and Assessment of Effectiveness of Dredging for Restoration of Dry Season Flow, Erosion Management and Navigation Improvement of Bangshi River |
|
2025 - 2028 |
National |
On Going |
30 |
CPI |
Preparing a Manual of Delta Appraisal Framework (DAF), Developing Training Module and Conducting ToT on DAF |
|
2025 - 2026 |
National |
On Going |
31 |
WSU |
CHTIRUWSSP/S-02/PMU Detailed Engineering Design for Water Supply and Sanitation for Cumilla, Ishwardi Cluster Towns & Khagrachari Town (DED-CTK) |
Department of Public Health |
2025 - 2027 |
National |
On Going |
32 |
ICT |
Consultancy Services for grid capacity study with an objective to optimize the integration of Variable Renewable Energy (VRE) |
SREDA |
2025 - 2026 |
National |
On Going |
33 |
WSU |
Metro Dhaka Water Security and Resilience Program |
The World Bank |
2025 - 2025 |
National |
Completed |
34 |
WSU |
Design & Drawings of Pipeline Section G & H under Package 3.1 of DESWSP |
Dhaka Water Supply and Sewerage Authority |
2025 - 2026 |
National |
On Going |
35 |
IGW |
A Study on Surface Water-Groundwater Interactions Modeling for Sustainable Development and Management of Transboundary Water Resources in the Teesta Basin |
JRC |
2025 - 2026 |
National |
On Going |
36 |
RME |
HMS for 2 Bridges on Teesta River |
|
2025 - 2025 |
National |
Completed |
37 |
SDT |
Field Survey for Railway Connectivity Improvement Preparatory Facility Project the People’s Republic of Bangladesh |
Consultancy Fee |
2025 - 2025 |
National |
On Going |
38 |
IGW |
Excavation/Re-excavation of connecting canal including dressing, levelling including pre and post work measurement to assess the surface water resources for efficient and sustainable use of irrigation water” under BADC |
Bangladesh Agriculture Development Corporation |
2025 - 2025 |
National |
On Going |
39 |
CPI |
Feasibility Study for improvement of drainage congestion in the Bhabodah Area in Jashore District and development of sediment management plan for the Sibsa and Pussur River basins of South-West region of Bangladesh |
Bangladesh Water Development Board |
2025 - 2026 |
National |
On Going |
40 |
WSU |
Feasibility Study for the Implementation of Water Supply and Sanitation Schemes under proposed Municipal Water Supply & Sanitation Project (Package No.: BMWSSP/SD-16 |
Department of Public Health |
2025 - 2027 |
National |
On Going |
41 |
FRM |
Study for Investigation of Integrated Flood and River Management and Drainage Improvement Measures in Little Feni and Bamni River Basin |
Bangladesh Water Development Board |
2025 - 2025 |
National |
Completed |
42 |
RME |
Consultancy Services for Monitoring of Hydraulic & Morphological Conditions of Padma River for the Safety of the River Training Works of Padma Bridge for 5 (Five) Years |
Bangladesh Bridge Authority |
2025 - 2030 |
National |
On Going |
43 |
WSU |
Preparation of Design Drawing for Savar-Keraniganj Wellfield Transmission Pipeline Relocation under MRT Line-5 Stations at Gabtoli, Mirpur 1 and Mirpur 10 and Construction Supervision of the Relocation works during Implementation |
Consultancy |
2025 - 2026 |
National |
On Going |
44 |
WSU |
Detailed Design, Drawings and BOQ Preparation of Water Supply, Drainage, Sewerage System, Gas Distribution, Electricity Supply and Roads for Trust Green City Area. |
Bangladesh Army |
2025 - 2026 |
National |
On Going |
45 |
FRM |
Consultancy Service for Feasibility Study for Integrated Water Resources Management of Major Rivers in Netrokona District |
Bangladesh Water Development Board |
2025 - 2026 |
National |
On Going |
46 |
SDT |
Topographical Survey for Supporting the F/S (Feasibility Study) and Basic Design for Dhaka Metro Line 4 Construction Project in Bangladesh |
Design Development & Construction |
2025 - 2025 |
National |
Completed |
47 |
RME |
HYDRO-MORPHOLOGICAL STUDY IN CONNECTION WITH DHAKA METRO LINE 4 CONSTRUCTION PROJECT IN BANGLADESH |
Design Development & Construction |
2025 - 2025 |
National |
Completed |
48 |
RME |
Feasibility Study of Connecting Roads of Proposed Kushiyara Bridge at 18th km of Moulvibazar (Rajanagar)-Sylhet (Balaganj) (Z-2017) Road Under Moulvibazar Road Division During the year 2024-25 |
Good |
2025 - 2025 |
National |
On Going |
49 |
RID |
Challenges of Safe Water in South-West Coastal Region. Learning from Gabura, Padmapukur and Way |
MoWR |
2025 - 2025 |
National |
On Going |
50 |
WSU |
ADB LOAN 51296-002 BAN: CHTIRUWSSP/S-01/PMU Project management & Construction Supervision Consultant (PMCS) |
Department of Public Health |
2025 - 2028 |
National |
On Going |
51 |
RID |
Local Level Flood Risk Mapping using Artificial Neural Network |
MoWR |
2025 - 2026 |
National |
On Going |
52 |
WSU |
Updating of the Sewerage Master Plan for Dhaka City |
UNICEF |
2025 - 2026 |
National |
On Going |
53 |
RME |
Bank Protection Work Along the Left Bank of Padma River at Mokshedpur to Baghra Bazar from Km. 25.400 To Km 29.900=4500m in Dohar Upazilla, Dist-Dhaka Under Dhaka O&M Division-11, BWDB, Dhaka |
Bangladesh Army |
2025 - 2026 |
National |
On Going |
54 |
FRM |
Earth Observation-based Technologies in Bangladesh (HERON Project) |
|
2024 - 2027 |
National |
On Going |
55 |
RME |
Hydro-Morphological Study of Bridges under Rajshahi and Rangpur Divisions |
Local Government Engineering Department |
2024 - 2026 |
National |
On Going |
56 |
RME |
Risk & Adaptation Interventions for Bangladesh Green Rail Transport Project |
|
2024 - 2025 |
National |
On Going |
57 |
ICT |
Feasibility Study on Expand of “National Emergency Service-999” of Bangladesh Police |
|
2024 - 2025 |
National |
On Going |
58 |
CPI |
Action Research program on polders of the Future: Sustainable Water Management and Resilient Livelihood in Polder 31 |
The Netherlands Govt. |
2024 - 2025 |
National |
On Going |
59 |
SDT |
Consulting services for Matarbari Port Development Project (Basin Area Survey) in people’s republic of Bangladesh |
Consultancy |
2024 - 2025 |
National |
Completed |
60 |
CPI |
Conducting a Baseline Study on the Sustainable Development of Blue Economy in Bangladesh |
Planning Commission |
2024 - 2025 |
National |
Completed |
61 |
SDT |
Offshore Multibeam Bathymetric Survey, Current Measurement, and Sediment Data Collection for the Proposed Gas 80 km Pipeline Route from Moheshkhali to Barabkunda under GTCL |
|
2024 - 2025 |
National |
Completed |
62 |
CPI |
Consulting Services for a Feasibility Study for Emergency Flood Response project in the Flood/Disaster Affected Districts of Bangladesh |
Local Government Engineering Department |
2024 - 2025 |
National |
Completed |
63 |
RME |
Sub consultancy of Flood Forecasting and Integrated Flood Risk Management Planning Consultants for Beki, Buridehing and Jiadhal sub-basins of Brahmaputra River under Assam Integrated River Basin Management Project |
Danish Hydraulic Institute |
2024 - 2026 |
National |
On Going |
64 |
SPB |
Support Structure for implementation of the Global Shield in Bangladesh |
|
2024 - 2026 |
National |
On Going |
65 |
SDT |
Survey Support to IHI-SMCC JV in connection with monthly monitor the RTW area using Multibeam survey |
IHI |
2024 - 2025 |
National |
Completed |
66 |
IGW |
Real Time Evaluation of Extended Community Climate Change Project-Drought (ECCCP-Drought) of PKSF |
|
2024 - 2025 |
National |
Completed |
67 |
SDT |
Tidal Discharge and flow Velocity Measurement with sediment samplings of the Meghna and Tentulia Rivers near Elisha Ghat under GBM Fieldwork. |
|
2024 - 2025 |
National |
Completed |
68 |
SDT |
Survey Support to OTJ in connection with monthly monitor the RTW area using Multibeam survey |
JV of OTJ and JV of IHI-SMCC |
2024 - 2025 |
National |
Completed |
69 |
RME |
HYDRO-MORPHOLOGICAL STUDIES FOR DHAKA ELEVATED INNER CIRCULAR ROAD (WESTERN PART) |
Consultant |
2024 - 2024 |
National |
Completed |
70 |
SDT |
Multibeam Bathymetric Survey of the Right Bank of Padma River RTW at Jajira & Naria during 2024-25 |
Bangladesh Water Development Board |
2024 - 2025 |
National |
Completed |
71 |
ICT |
ODK based SSP Integration for Collaborative Forest Management and Monitoring |
Department of Forest |
2024 - 2025 |
National |
Completed |
72 |
ICT |
Updating & Implementation of Sub-Project Information Management System- Smart (SiMS-Smart), and limited scale morphological modelling as required for erosion protection and dredging of the morphologically critical areas of the selected sub projects (Task-F) under Consultancy Services for Design and Construction Supervision under CSAWM project (BWDB part) |
Bangladesh Water Development Board |
2024 - 2026 |
National |
On Going |
73 |
WSU |
Consultancy Services for “Coordination and Capacity Building Support to Institutions to ensure the quality of water in the Meghna River” |
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH |
2024 - 2026 |
National |
On Going |
74 |
HRD |
Earning based training by HRD |
None |
2024 - 2027 |
National |
On Going |
75 |
CPI |
Capacity Building for Climate Change Adaptation in South Asia |
IWM |
2024 - 2025 |
National |
Completed |
76 |
SDT |
Implementation Support Services in connection with different ongoing projects of BWDB during 2024-2025. |
Bangladesh Water Development Board |
2024 - 2025 |
National |
Completed |
77 |
CPI |
Feasibility Study of Improvement of Connectivity and Community Infrastructure Development in the Selected Polders of Coastal Zone of Bangladesh |
Local Government Engineering Department |
2024 - 2025 |
National |
Completed |
78 |
IGW |
Consultancy services for Minor Irrigation Development Project by Using Solar Energy (2nd Phase) |
Bangladesh Agriculture Development Corporation |
2024 - 2025 |
National |
Completed |
79 |
FRM |
Consultancy Service for Urban Flood Resilience Bangladesh |
|
2024 - 2024 |
National |
Completed |
80 |
IGW |
Assessment of the Present Irrigation Efficiency in different Agro-Ecological zone of Bangladesh |
Bangladesh Agriculture Development Corporation |
2024 - 2026 |
National |
On Going |
81 |
IGW |
Consultancy Service for Establishment of Groundwater Physical Model |
WARPO |
2024 - 2024 |
National |
Completed |
82 |
CCE |
Assessing climate vulnerability and risks of coastal islands and riverine char |
Department of Environment |
2024 - 2027 |
National |
On Going |
83 |
IGW |
Consultancy Service of “Greater Dhaka District Irrigation Area Development Project (4th Phase)” |
Bangladesh Agriculture Development Corporation |
2024 - 2024 |
National |
Completed |
84 |
SDT |
Consulting Services for Matarbari Port Development Project (Basin Area Survey) in People’s Republic of Bangladesh |
Consultancy |
2024 - 2024 |
National |
Completed |
85 |
IGW |
Comprehensive Study for Livelihood Improvements through Integrated Management of Land and Water Resources in Arial Beel Area |
Bangladesh Haor & Wetlands Development Board |
2024 - 2025 |
National |
On Going |
86 |
WSU |
Consultancy Services for Design and Construction Supervision under Establishment of Offsite Water Intake Facility for Rooppur Nuclear Power Plant |
Dhaka Water Supply and Sewerage Authority |
2024 - 2027 |
National |
On Going |
87 |
CPI |
Technical assessment of Tidal River Management (TRM) in the Sundarban region of Bangladesh |
The World Bank |
2024 - 2024 |
National |
Completed |
88 |
WSU |
Situational Analysis of Flood and Waterlogging Management of Sylhet City Corporation |
SNV |
2024 - 2024 |
National |
Completed |
89 |
IGW |
Hydrology Study for the Khulna Water Supply Project Phase 2 |
Asian Development Bank |
2024 - 2024 |
National |
Completed |
90 |
SDT |
Digital Topographic and Bathymetric survey along the right bank of Atai River |
Disaster Risk Management Enhancement Project (DRMEP) |
2024 - 2025 |
National |
Completed |
91 |
FRM |
Technical analysis of the Ganges flow at Farakka and Hardinge Bridge Point |
JRC |
2024 - 2024 |
National |
Completed |
92 |
IGW |
Consultancy Services for Developing Strategic Action Plan for Promotion & Adoption of Efficient Irrigation Technologies for Bangladesh and Preparing Different Training Modules |
Bangladesh Agriculture Development Corporation |
2024 - 2024 |
National |
Completed |
93 |
WSU |
Hydraulic Modelling and Detailed Design Works for Feeder Pipelines from Connection Points on Package 3.1 and Package 2 to DMA under DESWSP, Dhaka WASA |
China Geo-Engineering Corporation (CGC) |
2024 - 2025 |
National |
Completed |
94 |
RME |
HYDRO-MORPHOLOGICAL STUDIES AND RIVER TRAINING WORKS DESIGN FOR “DHAKA ELEVATED INNER CIRCULAR ROAD EASTERN BYPASS PART |
Consultant |
2024 - 2024 |
National |
Completed |
95 |
FRM |
Hydrological Impact Study of Modhu City at Taranagar, Keraniganj, Dhaka |
Dhaka |
2024 - 2024 |
National |
Completed |
96 |
IGW |
Comprehensive Study for Evaluation and Updating of Haor Master Plan |
Bangladesh Haor & Wetlands Development Board |
2024 - 2025 |
National |
On Going |
97 |
RME |
Topographical Survey and Hydrology Morphological Study with Feasibility Study for New Alignment Road & Bridge of Baragaria-Gohalbari-Jadabpur Kheya Gaht |
Good |
2024 - 2024 |
National |
Completed |
98 |
RME |
Consultancy Services for Monitoring of Hydraulic amd Morphological Condition of the Jamuna River for the safety of River Training Works of Bangabandhu Bridge for 5 (Five) years |
Bangladesh Bridge Authority |
2024 - 2029 |
National |
On Going |
99 |
CPI |
Consultancy Services for Mongla-Ghasiakhali Canal Upgrading project- Conceptual Study in Bangladesh |
Delta Context B.V. |
2024 - 2024 |
National |
Completed |
100 |
WSU |
'Consulting Services for Environmental and Social Framework Compliance Study for future Project (Rohingya Response)' |
Local Government Engineering Department |
2024 - 2024 |
National |
Completed |
101 |
CPI |
Securing the food systems of Asian Mega-Deltas for climate and livelihood resilience |
IWMI |
2024 - 2024 |
National |
Completed |
102 |
HRD |
Training to external Organization |
IWM |
2024 - 2024 |
National |
Completed |
103 |
WSU |
Feasibility Study for Improvement of Water Supply Network with District Metered Area System |
Rajshahi Water Supply & Sewerage Authority |
2024 - 2024 |
National |
Completed |
104 |
CPI |
Current and projected hydrological trends in the Sundarbans mangrove forest and their impacts on ecology and ecosystem services |
CSIRO |
2024 - 2025 |
National |
Completed |
105 |
IGW |
Detail study on water resources availability and impact shallow and deep aquifer, EIA, SIA and model simulation for Sreepur 150 (+10%) MW Power Plant Project |
B-R Powergen Ltd. (BRPL) |
2023 - 2025 |
National |
Completed |
106 |
CPI |
Climate Risk and Adaptation Interventions for Bangladesh Bay Terminal Project |
Stichting Deltares |
2023 - 2025 |
National |
Completed |
107 |
CPI |
Feasibility Study of Land Acquisition for Further Extension of the Port and Disposal of Dredged Material |
Mongla Port Authority |
2023 - 2024 |
National |
Completed |
108 |
CCE |
Assessment of Urban Heat Island (UHI) Effect at City Level |
Department of Environment |
2023 - 2025 |
National |
On Going |
109 |
SDT |
Support to IHI-SMCC JV for dredging and revetment works during 2023-24 |
JV of OTJ and JV of IHI-SMCC |
2023 - 2024 |
National |
Completed |
110 |
SDT |
Construction of Dual Gauge Railway Line from Bogura to Shahid M. Mansur Ali Station, Sirajganj of Bangladesh Railway |
Bangladesh Railway |
2023 - 2026 |
National |
On Going |
111 |
SDT |
Bathymetric Survey & Barge Positioning by using Multibeam and RTK-GPS during 2023-24 |
Engineering |
2023 - 2024 |
National |
Completed |
112 |
SPB |
TA-10090 BAN: Supporting Water Supply and Sanitation Regulatory Mechanism Development |
Asian Development Bank |
2023 - 2026 |
National |
On Going |
113 |
RME |
Intake Numerical Modelling study for Rajshahi WASA Surface Water Treatment Plant Project |
Rajshahi Water Supply & Sewerage Authority |
2023 - 2024 |
National |
Completed |
114 |
RME |
Hydro-Morphology Study of Bridges under Chattogram and Sylhet Divisions. |
Local Government Engineering Department |
2023 - 2025 |
National |
Completed |
115 |
FRM |
Feasibility Study for Rehabilitation Project of MUHURI-KAHUA Flood Control, Drainage and Irrigation Project In Feni District |
Bangladesh Water Development Board |
2023 - 2025 |
National |
Completed |
116 |
RME |
Mathematical Modelling studies of Existing Railway Lines for Railway Connectivity Improvement Preparatory Facility(RCIPF) Project of Bangladesh Railway. (RCIPF 2, 4 and 5) |
Oriental Consultants Global Co. Ltd. |
2023 - 2025 |
National |
Completed |
117 |
FRM |
Feasibility Study for Riverbank Protection Works, Wave Protection and Re-excavation of Khal in Ten Upazilas under Kishoreganj District |
Bangladesh Water Development Board |
2023 - 2025 |
National |
On Going |
118 |
WSU |
Modelling and Detail Design of Pipe line distribution network of two selected DMA under NCB-02 12A |
IWM |
2023 - 2026 |
National |
On Going |
119 |
ICT |
Climate and Disaster Resilient Urban Development in Bangladesh |
HaskoningDHV Nederland B.V. |
2023 - 2024 |
National |
Completed |
120 |
RME |
Mathematical Modelling Studies of Railway Connectivity Improvement Preparatory Facility (RCIPF, 1-3-6) Project |
Oriental Consultants Global Co. Ltd. |
2023 - 2025 |
National |
On Going |
121 |
FRM |
HYDROLOGICAL STUDY AND FIELD SURVEY TO FACILITATE THE IMPLEMENTATION PLAN OF ADDITIONAL STUDY OF HFMLIP |
Bangladesh Engineering & Technology Servces |
2023 - 2024 |
National |
Completed |
122 |
FRM |
Feasibility Study on Integrated Development of Goranchatbari Retention Pond in Dhaka City |
Bangladesh Water Development Board |
2023 - 2025 |
National |
Completed |
123 |
SDT |
Implementation of Support Services in Connection with Different ongoing Projects during 2023-24 of BWDB |
Bangladesh Water Development Board |
2023 - 2024 |
National |
Completed |
124 |
SDT |
Multibeam Bathymetric Survey of the Right Bank of Padma River RTW at Jajira & Naria during 2023-24 |
Bangladesh Water Development Board |
2023 - 2024 |
National |
Completed |
125 |
WSU |
Review of Water Supply Master Plan of DWASA |
Dhaka Water Supply and Sewerage Authority |
2023 - 2025 |
National |
Completed |
126 |
CPI |
Marine Spatial Planning and Stakeholder Consultation |
Directorate of Fisheries |
2023 - 2025 |
National |
Completed |
127 |
WSU |
Supervision of Tubewell construction of DWASA |
Dhaka Water Supply and Sewerage Authority |
2023 - 2024 |
National |
Completed |
128 |
RID |
Consultancy Services for Bird and Bat Survey at Two Locations in Connection with Wind Energy Assessment |
SREDA |
2023 - 2025 |
National |
Completed |
129 |
RME |
Topographic Survey and Hydro-morphological Study with Mathematical Modelling for the project conversion of Meter Gauge Line into Dual Gauge from Parbatipur Kaunia Section of Bangladesh Railway. |
Consultancy |
2023 - 2025 |
National |
Completed |
130 |
CPI |
Action on the Ground (Data and science to support water and climate policy) |
Stichting Deltares |
2023 - 2025 |
National |
Completed |
131 |
RME |
Sustainable River Management in Panchagarh and Thakurgaon District |
Bangladesh Water Development Board |
2023 - 2024 |
National |
Completed |
132 |
RME |
Feasibility Study for the Management of Mahananda River in Chapainawabganj District and Padma River Basin in Chapainawabganj, Rajshahi and Natore District |
Bangladesh Water Development Board |
2023 - 2024 |
National |
Completed |
133 |
WSU |
Monitoring & supervision of water supply and sanitation schemes in Cox Bazar Host Community |
Department of Public Health |
2022 - 2025 |
National |
On Going |
134 |
CPI |
Feasibility Study for Restoration and Development of Water Resource Management System of Polder 31 under Dacope Upazila in Khulna District |
Bangladesh Water Development Board |
2022 - 2024 |
National |
Completed |
135 |
CPI |
Hydrological and Hydraulic Study for Integrated Water Resources Management & Development of Polder 73/1 (A+B) & 73/2 under Hatiya Upazila in Noakhali District |
Bangladesh Water Development Board |
2022 - 2024 |
National |
Completed |
136 |
WSU |
Feasibility Study for Flood Management & Reduction of Drainage Congestion in Sylhet Metropolitan Area |
Sylhet City Corporation |
2022 - 2025 |
National |
Completed |
137 |
SDT |
River Survey (bathymetric, ADCP and Float Tracking) & multibeam echosounder survey and bathymetric survey of the distributaries |
Bangladesh Water Development Board |
2022 - 2026 |
National |
On Going |
138 |
FRM |
Flood Forecasting and Early Warning System for Karnali and Narayani River Basin in Nepal |
None |
2022 - 2025 |
International |
On Going |
139 |
IGW |
Feasibility study for the Management of the Padma River Basin and Rehabilitation of Pabna Irrigation and Rural Development Project in Pabna District- Mathematical Modelling Component |
Bangladesh Water Development Board |
2022 - 2024 |
National |
Completed |
140 |
WSU |
Feasibility Study & Detail Drawing on Appropriate WS in Coastal Areas |
Department of Public Health |
2022 - 2025 |
National |
On Going |
141 |
ICT |
Preparation of Wind map of Bangladesh (GIS based data platform creation, wind map preparation and dynamic data input system preparation) |
SREDA |
2022 - 2025 |
National |
Completed |
142 |
WSU |
Pre-feasibility study, Design & const supervision of rural piped water supply- SD 15 |
Department of Public Health |
2022 - 2028 |
National |
On Going |
143 |
SDT |
Input of Hydrologist for MRT Project |
Dhaka |
2022 - 2026 |
National |
On Going |
144 |
ICT |
Consultancy Services for Procurement of Web Mapping: Development of Web Application for GIS Database Management and its Visualization (Package-09). |
MOLAND |
2022 - 2025 |
National |
On Going |
145 |
ICT |
Consultancy Services for Procurement of Mauza Map Digitization and Geodatabase Creation, Barishal Division (Package-07) |
MOLAND |
2022 - 2025 |
National |
On Going |
146 |
ICT |
Consultancy Services for Procurement of Mauza Map Digitization and Geodatabase Creation, Barishal Division (Package-07) |
Mauza & Plot based National Digita Land Zoning Project |
2022 - 2024 |
National |
Completed |
147 |
IGW |
'Detail Feasibility Study PRA & FS and Detail Design (DD) under Small Scale Water Resources Development Project (Phase-2) (SSSWRDP-2)' |
Local Government Engineering Department |
2022 - 2025 |
National |
Completed |
148 |
ICT |
Consultancy Services for Procurement of Mauza Map Digitization and Geodatabase Creation, Dhaka Division (Package-05) |
MOLAND |
2022 - 2026 |
National |
On Going |
149 |
CPI |
Rehabilitation of Coastal Embankment with Drainage Improvement & Bank Protection at Mujib Nagar & Manpura of Bhola District (1st Phase) |
Bangladesh Water Development Board |
2022 - 2024 |
National |
Completed |
150 |
ICT |
Package 5 (Dhaka Division) - Mauza Map Digitization and Geo database creation |
Mauza & Plot based National Digita Land Zoning Project |
2022 - 2024 |
National |
Completed |
151 |
SDT |
In house training on data processing |
IWM |
2022 - 2022 |
National |
Completed |
152 |
CPI |
Knowledge Product Multi-Sectorial Approaches to Delta Management |
- N/A - |
2022 - 2023 |
National |
Completed |
153 |
WSU |
Preparation of RAP for Saidabad WTP Project Phase III |
Dhaka Water Supply and Sewerage Authority |
2022 - 2022 |
National |
Completed |
154 |
CPI |
CEIP-Study during Implementation |
Bangladesh Water Development Board |
2022 - 2025 |
National |
Completed |
155 |
SDT |
Multibeam Survey for Single Point Mooring Project |
- N/A - |
2022 - 2022 |
National |
Completed |
156 |
WSU |
Design of drainage system of 5 khals |
Dhaka Water Supply and Sewerage Authority |
2022 - 2022 |
National |
Completed |
157 |
FRM |
CSIRO-AICAR: Assessing constraints & opportunities for future research into intensification of cropping systems in Southern Bangladesh |
Dhaka |
2022 - 2022 |
National |
Completed |
158 |
HRD |
Collaborative training & workshops with BWP |
- N/A - |
2022 - 2022 |
National |
Completed |
159 |
IGW |
Feasibility Study for Augmentation, Conservation and Wise Use of Surface Water Resources through Dredging of the Upstream of Teesta Barrage and Bank |
Bangladesh Water Development Board |
2022 - 2024 |
National |
Completed |
160 |
WSU |
Modelling & DD for Water Supply Network of Aftabnagar |
None |
2022 - 2022 |
National |
Completed |
161 |
WSU |
Restoration of Waterbodies for Sustainable Water Management in Dhaka Watershed |
Asian Development Bank |
2022 - 2025 |
National |
Completed |
162 |
ICT |
Sub-project for ICT-GIS division under FMG project (P-52632 |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
163 |
CPI |
Mathematical Model Study for Integrated Development and Sustainable Management Plan of Shahbazpur Channel of Lower Meghna River |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
164 |
FRM |
Development of a web-based cyclone surge induced inundation monitoring & local level forecasting system in polder protected areas of coastal region |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
165 |
RME |
Feasibility Study for Protection of Majhir Ghat Area from Bank Erosion of Padma River in Upazila Zajira, District Shariatpur |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
166 |
RME |
Hydro-morphological study of three bridges over the Jamuna at Chilamari-Rowmari, lower Meghna at Barisla-Bhola and Meghna branch at Maya Ferry ghat |
Bangladesh Bridge Authority |
2022 - 2024 |
National |
Completed |
167 |
RME |
Hydro-morphological Study of Jamuna River at Manikganj |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
168 |
RME |
Hydro-Morphological Study of The Padma River and Impact Assessment of the ongoing Intervention at Upstream and Downstream of The Padma Bridge |
Bangladesh Army |
2022 - 2025 |
National |
Completed |
169 |
ICT |
Development of Upazila Land Suitability Assessment and Crop Zoning System of Bangladesh (Phase-II) |
Bangladesh Agriculture Research Council |
2022 - 2026 |
National |
On Going |
170 |
SDT |
Detailed topographic survey for proposed Bogura to SMA Station Sirajganj railway line |
RITES in JV with AARVEE Associates Architects Engineers & Consultant Pvt Ltd. |
2022 - 2024 |
National |
Completed |
171 |
FRM |
Feasibility Study for Developing Eco-Friendly Reservoirs for Conservation and Utilization of Excess Rainwater of Hilly Streams of Sitakund |
Bangladesh Water Development Board |
2022 - 2023 |
National |
Completed |
172 |
SDT |
Bathymetric Survey by Low frequency Echosounder |
Nippon Koei |
2022 - 2022 |
National |
Completed |
173 |
FRM |
Hydro-morphological Study for Assessing the Adequacy and Effectiveness of the Proposed Interventions |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
174 |
RME |
Feasibility Study for Protection from right bank erosion of the Padma River in Upazila Bhedarganj, District Shariatpur |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
175 |
RME |
Sirajganj-Bogra Railway Line Construction - Hydro-morphological Mathematical Modelling Study |
RITES in JV with AARVEE Associates Architects Engineers & Consultant Pvt Ltd. |
2022 - 2024 |
National |
Completed |
176 |
CPI |
The selection of best suitable alignment for installation of submarine cable to connect Monpura Island with national power grid" |
West Zone Power Distribution Company Limited |
2022 - 2022 |
National |
Completed |
177 |
WSU |
Study for AC Pipes Replacement in MODS Zone 1, 2, 3 & 6 under DWASA. |
Dhaka Water Supply and Sewerage Authority |
2022 - 2022 |
National |
Completed |
178 |
SDT |
Support to OTJJR for Dredging Protection Work |
JV of OTJ and JV of IHI-SMCC |
2022 - 2024 |
National |
Completed |
179 |
SDT |
Analysis of Suspended Sediment for total concentration |
JHCEC-CCECC |
2022 - 2022 |
National |
Completed |
180 |
FRM |
Capacity Development for Enhanced Flood Forecasting and Warning Services of Bangladesh (Phase-I) |
Bangladesh Water Development Board |
2022 - 2023 |
National |
Completed |
181 |
IGW |
ESIA and ESMP Compliance and Effect Monitoring of the Sustainable Coastal and Marine Fisheries Project (SCMFP) |
Directorate of Fisheries |
2021 - 2022 |
National |
Completed |
182 |
RME |
Hydrology and Morphology Study for Kulaghat Bridge over Ratnai River at 7th km of Nageswari-Kashipur-Kulaghat-Lalmonirhat Regional Highway (R561) under Lalmonirhat Road Division |
Good |
2021 - 2022 |
National |
Completed |
183 |
RME |
Hydro-morphological study of the Dudhkumar River for 2nd Dudhkumar bridge at 37th km at Z-5624, Kurigram, 2020-21" |
Good |
2021 - 2022 |
National |
Completed |
184 |
RME |
Detailed Feasibility Study for Identifying Erosion Vulnerability and Protection of Proposed Economic Zone Construction at Bhuapur Upazilla in Tangail District |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
185 |
CPI |
Feasibility Study for Restoration and Development of Water Resource Management System of Kutubdia and Matarbari Island |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
186 |
FRM |
Expansion flood forecasting model & Improve inundation model in coastal and hotspot areas |
Bangladesh Water Development Board |
2021 - 2024 |
National |
Completed |
187 |
SDT |
Water level measurement in the Pussur & Shibsa System during December 2021 |
JHCEC-CCECC |
2021 - 2022 |
National |
Completed |
188 |
RME |
Chandpur Town Protection Works |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
189 |
WSU |
Project Mgt & Cons Supervision of Khulna Sewerage System Development Project |
Khulna WASA |
2021 - 2024 |
National |
Completed |
190 |
RME |
Hydro-Morphological Study of the Meghna River for technical feasibility of the bridges at Gazaria-Munshiganj and at Shariatpur-Chandpur Road |
None |
2021 - 2024 |
National |
Completed |
191 |
RME |
Hydro-Morphological Study of 120 meter long Bridge at Meghna Economic Zone connecting road under Road Division Narayangonj during the year 2020-2021 |
Good |
2021 - 2022 |
National |
Completed |
192 |
RME |
Hydro-Morphological Study of 180 meter long Bridge along with approach road at Cumilla Economic Zone connecting road under Road Division Narayangonj during the year 2020-2021 |
Good |
2021 - 2022 |
National |
Completed |
193 |
CPI |
Feasibility Study for Flood and Erosion Management of the Sheikh Hasina Cantonment |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
194 |
SDT |
Bathymetric Survey of the Padma River at Rajbari |
Bangladesh Water Development Board |
2021 - 2021 |
National |
Completed |
195 |
CPI |
Preparation of Draft DPP including Feasibility Study for Upgradation of CDDL by constructing second Dry Dock including associated Shipbuilding Infrastructure project |
Chittagong Dry Doc Ltd. |
2021 - 2022 |
National |
Completed |
196 |
SDT |
Sediment Sampling and Analysis in connection with Mongla Port Dredging Work |
China Harbour |
2021 - 2021 |
National |
Completed |
197 |
SDT |
Support to IHI for dredging and revetment works |
Dhaka |
2021 - 2023 |
National |
Completed |
198 |
SDT |
Survey works related to Disaster Risk Management Enhancement Project (DRMEP) |
Dhaka |
2021 - 2021 |
National |
Completed |
199 |
CPI |
Re-location of Existing Private Dockyards from the Bank of Buriganaga and Development of a Plan for Standard Dockyards Zone |
BanglaDesh Inter-water Transport Authority |
2021 - 2022 |
National |
Completed |
200 |
SDT |
Analysis of water sample in connection with Payra Port Dredging Work |
Jan De Nul NV, Belgium |
2021 - 2022 |
National |
Completed |
201 |
RME |
Mathematical Modelling Study for Selection of Two Intake Point locations on Padma River banks near Hardinge Bridge |
NJS Ltd & Aqua Consultant |
2021 - 2022 |
National |
Completed |
202 |
IGW |
Updating Feasibility Study for Kurigram Irrigation Project (North and South Unit) |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
203 |
IGW |
Mathematical Modelling Study for Rehabilitation of Barisal Irrigation Project (BIP) |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
204 |
RME |
Feasibility Study and Detail Design for Construction of Large Bridges on upazilla, Union & Village Road Project (FSB)-LBSP-2 |
Local Government Engineering Department |
2021 - 2022 |
National |
Completed |
205 |
SDT |
Bathymetric Survey of the Halda River for 20ECB |
Bangladesh Army |
2021 - 2021 |
National |
Completed |
206 |
WSU |
Supervision works for Test /Production Tubewell & Aquifer Test, Topographic survey and Data collections in Purbachol area |
- N/A - |
2021 - 2022 |
National |
Completed |
207 |
SDT |
Bathymetric Survey of the Halda River for BWDB |
Bangladesh Water Development Board |
2021 - 2021 |
National |
Completed |
208 |
FRM |
Supporting tasks for MOWR/BWDB Technical Committee related to FMG |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
209 |
SDT |
JDN Payra Port soil Sample Analysis |
Jan De Nul NV, Belgium |
2021 - 2025 |
National |
Completed |
210 |
RME |
Mathematical modelling study for selection of an Intake Point location in the left branch of Meghna & Dhonagoda River |
Department of Public Health |
2021 - 2022 |
National |
Completed |
211 |
SDT |
Multibeam Bathymetric Survey of the Padma River at Naria |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
212 |
FRM |
Data Collection and Regional Model Validation for 2020 |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
213 |
SDT |
Implementation support service to BWDB Taskforce during 2021-22 |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
214 |
FRM |
Feasibility Study for Drainage Improvement in Uttara Sector 2, 4, 6 & 8 under Dhaka North City Corporation |
Dhaka North City Corporation |
2021 - 2021 |
National |
Completed |
215 |
RME |
Mathematical modeling study for sustainable management of the Gorai River basin including offtake |
Bangladesh Water Development Board |
2021 - 2025 |
National |
Completed |
216 |
RME |
Hydrological and Morphological Study for Construction of 5.6 km Naradaha-Khaschar Link Road including Two Bridges at Naradaha and Khaschar under Pabna Road Division |
Good |
2021 - 2022 |
National |
Completed |
217 |
SDT |
Dredging/Re-Excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project |
Bangladesh Army |
2021 - 2025 |
National |
On Going |
218 |
RME |
MORPHOLOGICAL STUDY OF THE PADMA RIVER FOR THE POSITION OF FOUR TOWERS OF THE 230KV BHERAMARA HVDC-ISWARDI TRANSMISSION LINE UNDER PGCB, ISWARDI |
Power Grid Company of Bangladesh Ltd. (PGCB) |
2021 - 2021 |
National |
Completed |
219 |
SDT |
Bathymetric Survey in the Sangu River and cross section /topographic survey along Painchara, a tributary of the Sangu River in the nearby areas of Bandarban District Town |
NJS Ltd & Aqua Consultant |
2021 - 2021 |
National |
Completed |
220 |
RME |
Hydrology & Morphological Study of Ichamoti River For Construction of Kunderbazar Bridge at 6th km. (Ch. 5+570) of Munshigonj (Hatimara)-Kunderbazar-Sreenagar (Sanbari) during the Year 2020-2021 |
Good |
2021 - 2022 |
National |
Completed |
221 |
CPI |
Hydro-morphological Model Study and Strategic Planning for Char Development in the Meghna Estuary under CDSP Project phase IV-B(AF) |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
222 |
CPI |
DETAILED HYDROLOGICAL AND MORPHOLOGICAL SURVEY AND STUDY FOR MATARBARI PORT DEVELOPMENT PROJECT (RHD COMPONENT) |
Oriental Consultants Global Co. Ltd. |
2021 - 2021 |
National |
Completed |
223 |
FRM |
Flash Flood Early Warning System for North-Eastern Part of Bangladesh, Extended Project |
Bangladesh Water Development Board |
2021 - 2021 |
National |
Completed |
224 |
RME |
Hydro-morphological Survey and Investigation of the Padma/Ganges River in Connection with Land Reclamation in the Padma River adjacent to the Rajshahi City Corporation Area |
Rajshahi City Corporation |
2021 - 2021 |
National |
Completed |
225 |
SDT |
Topographic Survey for Matarbari Port |
Nippon Koei |
2021 - 2021 |
National |
Completed |
226 |
RME |
Hydro-Morphological Study of Proposed Bridge over the Kushiyara River at (Z-2017) Road, RHD, Moulvibazar |
Good |
2021 - 2021 |
National |
Completed |
227 |
RME |
Hydro-Morphological Study of proposed 2nd Monu Bridge at road N-207, RHD, Moulvibazar |
Good |
2021 - 2021 |
National |
Completed |
228 |
IGW |
Consultancy Services for Participatory Rural Appraisal (PRA) and Baseline Study of the State of Water Resources in the High Barind Region |
WARPO |
2021 - 2022 |
National |
Completed |
229 |
WSU |
Independent engineer services fort the development of water distribution and supply facilities at Purbachal new town project through public private partnership |
Rajdhani Unnyan Kortripaksha |
2021 - 2028 |
National |
On Going |
230 |
WSU |
Construction Supervision of Roads & Drains for Zone 01 to 05 under GCC 2nd Phase |
Gazipur City Corporation |
2021 - 2022 |
National |
Completed |
231 |
SDT |
Topographic Survey for Matarbari LNG Project |
Nippon Koei |
2021 - 2021 |
National |
Completed |
232 |
SDT |
Survey, data collection and processing for Installation and maintenance of water gauges |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
233 |
RME |
Darshana-Meherpur Rail Line - Hydro-morphological Study |
SMEC |
2021 - 2021 |
National |
Completed |
234 |
IGW |
Study for Hydrological Investigation & Modelling of the State of Surface Water and Groundwater Resources in the High Barind Region |
WARPO |
2021 - 2023 |
National |
Completed |
235 |
WSU |
Master Plan on Meghna River Pollution Control, Navigability Increase and Ensuring Riverbank Stability |
Dhaka Water Supply and Sewerage Authority |
2021 - 2022 |
National |
Completed |
236 |
ICT |
Site Specific Plan (SSP) and ODK Development for SUFAL Project |
Bangladesh Forest Department |
2021 - 2021 |
National |
Completed |
237 |
SDT |
Support to CEIP 1 |
DHV |
2021 - 2022 |
National |
Completed |
238 |
CPI |
Water Management knowledge and Innovation Program (WMKIP)-2021 |
Stichting Deltares |
2021 - 2021 |
National |
Completed |
239 |
WSU |
Design Review and Construction Supervision of Mirersharai WTP |
Bangladesh Economic Zone Authority |
2021 - 2027 |
National |
On Going |
240 |
RME |
Different River Crossing (Padma, Payra, Sugandha) for Infrastructure Development of Payra-Gopalgonj-Aminbazar 2nd 400kV Double Circuit Transmission line |
Bangladesh-China Power Company (pvt.) limited |
2020 - 2021 |
National |
Completed |
241 |
WSU |
Water Assessment of BATB factories at Dhaka and Kushtia |
None |
2020 - 2021 |
National |
Completed |
242 |
SDT |
Survey work at Paturia & Daulatdia |
BanglaDesh Inter-water Transport Authority |
2020 - 2021 |
National |
Completed |
243 |
WSU |
ESIA and RAP of Japanese EZ in Araihazar |
Bangladesh Economic Zone Authority |
2020 - 2021 |
National |
Completed |
244 |
WSU |
Detailed Design & Construction Supervision of Water Supply Network under Tetulzhora-Bhakurta Well Field Project Area |
Dhaka Water Supply and Sewerage Authority |
2020 - 2022 |
National |
Completed |
245 |
CCE |
Understanding the Sea Level Rise Dynamics of Bangladesh along the Coast |
Met Office |
2020 - 2022 |
National |
Completed |
246 |
RME |
Four Border Rivers of the NE Region - Hydro-morphological Study |
Good |
2020 - 2021 |
National |
Completed |
247 |
RME |
Kangsha Bridge on the Kangsha River - Hydro-morphological Study |
Good |
2020 - 2021 |
National |
Completed |
248 |
FRM |
JICA preparatory survey for Urban Development |
Dhaka |
2020 - 2021 |
National |
Completed |
249 |
CPI |
Pathway of scaling agriculture innovations for sustainable intensification in polders of Coastal Bangladesh |
International Rice Research Institute |
2020 - 2023 |
National |
Completed |
250 |
RME |
Hydrological & Morphological Survey and 2D Hydrodynamic and Morphological Modelling for Construction of Bangabandhu Sheikh Mujib Railway Bridge |
JV of OTJ and JV of IHI-SMCC |
2020 - 2026 |
National |
On Going |
251 |
FRM |
Updating and Maintenance of FFWS of FFWC |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
252 |
SDT |
Bathymetric Survey for Gorai River Bank Protection & Dredging Work |
Bangladesh Water Development Board |
2020 - 2022 |
National |
Completed |
253 |
ICT |
Mapping and Data Support for Potential Fishing Zone (PFZ) Identification. Sub Project of P10549 |
- N/A - |
2020 - 2021 |
National |
Completed |
254 |
ICT |
Land Cover Mapping for Hill Tract (Chattogram) Area_Sub P52102 |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
255 |
CPI |
Development of Ferry Ghats at Sariakandi, Bogura and Madarganj, Jamalpur for introducing ferry service between those place |
BanglaDesh Inter-water Transport Authority |
2020 - 2022 |
National |
Completed |
256 |
FRM |
Feasibility Study for Re-excavation of New Dakatia River in Cumilla and Chandpur District |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
257 |
CPI |
Assessment of Storm Surge, Cyclone and Flood Forecasting in Bangladesh and Recommendation to Improve Forecasting for Decision-Making |
CDR International B.V. |
2020 - 2020 |
National |
Completed |
258 |
WSU |
WQ Assessment under Shuvadya Khal Feasibility Study |
Bangladesh Water Development Board |
2020 - 2020 |
National |
Completed |
259 |
RME |
Rahmatpur Bridge on the Old Brahmaputra River - Hydro-morphological Study |
Good |
2020 - 2020 |
National |
Completed |
260 |
CPI |
Hydro-morphological Mathematical Modelling Study for Re-excavation of 83 Rivers/khals and Increase Navigation of Mongla-Ghasiakhali Channel in Bagerhat district |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
261 |
RME |
Morphological Study of the Jamuna for River Crossing of Power Transmission Line |
Power Grid Company of Bangladesh Ltd. (PGCB) |
2020 - 2021 |
National |
Completed |
262 |
RME |
Morphological Survey of Different River Crossing (Padma and Jamuna) for Infrastructure Development for power Evacuation facilities of Rooppur Nuclear power plant |
Power Grid Company of Bangladesh Ltd. (PGCB) |
2020 - 2021 |
National |
Completed |
263 |
FRM |
Feasibility Study for Re-excavation of Shuvadya Khal along with Development and Protection of its both Banks. |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
264 |
WSU |
Design and modelling for ICB 2.10 under DWSNIP |
Dhaka Water Supply and Sewerage Authority |
2020 - 2023 |
National |
Completed |
265 |
SDT |
Hydromorphological Survey for Land Reclamation (CDSP-III) |
CDSP |
2020 - 2021 |
National |
Completed |
266 |
SDT |
Bathymetric survey at Lower Meghna |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
267 |
RME |
3 New Rail Line, and a New Rail Bridge over the Teesta River - Hydro-morphological Study |
Bangladesh Railway |
2020 - 2021 |
National |
Completed |
268 |
RME |
Padma Bridge Modelling |
Dhaka |
2020 - 2021 |
National |
Completed |
269 |
RME |
Shikirhat Bridge on the Bhairab River - Hydro-morphological Study |
Good |
2020 - 2020 |
National |
Completed |
270 |
SDT |
Implementation support support service to BWDB Taskforce |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
271 |
SDT |
Multibeam Echosounder Survey at Naria |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
272 |
FRM |
Regional Models Validation for 2019 |
IWM |
2020 - 2021 |
National |
Completed |
273 |
CPI |
Current and future state of the Ganges-Brahmaputra-Meghna delta |
- N/A - |
2020 - 2025 |
National |
Completed |
274 |
RME |
Shuvapur Bridge on the Feni River - Hydro-morphological Study |
Good |
2020 - 2020 |
National |
Completed |
275 |
SDT |
Support to WUR in Research Project "Deltas Out of Shape" |
WSP |
2020 - 2021 |
National |
Completed |
276 |
FRM |
Basic WR Data Collection for Southern Chattagram-FMG Part_Sub Project of SDT |
Dhaka |
2020 - 2021 |
National |
Completed |
277 |
ICT |
Developing Disaster and Climate Change Risk Profile of Industry Sector in Bangladesh |
UNDP |
2020 - 2021 |
National |
Completed |
278 |
SDT |
Survey of proposed Landing station & Vessel Shelter for BIWTA |
Design Development & Construction |
2020 - 2021 |
National |
Completed |
279 |
SDT |
Multibeam Echosounder Survey at Payra Power Plant |
Dhaka |
2020 - 2020 |
National |
Completed |
280 |
SDT |
Providing input of Hydrologist to Nippon Koei in South Chattogram Project |
Dhaka |
2020 - 2021 |
National |
Completed |
281 |
ICT |
Preparation of GIS Maps (City & Ward) for Chattogram City Corporation (CCC). |
Chattogram City Corporation |
2020 - 2022 |
National |
Completed |
282 |
SDT |
JICA Basic Data Collection and Monitoring of River Water |
Dhaka |
2020 - 2021 |
National |
Completed |
283 |
SDT |
Discharge Measurement for Kohelia River |
Dhaka |
2020 - 2020 |
National |
Completed |
284 |
IGW |
Groundwater Hydrological Study for the proposed Project of "Probable Site Selection for Construction of Nuclear Power Plant in the Southern Part of Bangladesh" |
Bangladesh Atomic Energy Comission |
2020 - 2020 |
National |
Completed |
285 |
CPI |
Water Management Knowledge and Innovation Program 2020 |
Stichting Deltares |
2020 - 2020 |
National |
Completed |
286 |
SDT |
Survey support to Mitamoin Cantonment Project |
Bangladesh Army |
2019 - 2024 |
National |
Completed |
287 |
WSU |
Feasibility Study in connection with Preparation of DPP for Construction and Rehabilitation of DTW in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2019 - 2020 |
National |
Completed |
288 |
SDT |
Met Ocean survey for Payra Port |
Bangladesh University of Engineering & Technology |
2019 - 2020 |
National |
Completed |
289 |
RME |
Mathematical Modelling Study for Bridges along the Nasirnagar R&H-Bholakot Bazar-Chatalpara GC-Aruail Road |
Local Government Engineering Department |
2019 - 2020 |
National |
Completed |
290 |
FRM |
Feasibility Study for Flood Control, Drainage, Irrigation and Dredging of Bakkhali River in Cox's bazar District |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
291 |
CPI |
Surface Water Hydrological Study for Selection of Potential Locations for Nuclear Power Plant in Southern Region of Bangladesh |
Bangladesh Atomic Energy Comission |
2019 - 2020 |
National |
Completed |
292 |
CPI |
Feasibility Study for the Development and Management of Karnafuli River Basin (with Halda river) |
Bangladesh Water Development Board |
2019 - 2021 |
National |
Completed |
293 |
CPI |
Feasibility Study for Protection and Development of Kuakata Sea Beach |
Bangladesh Water Development Board |
2019 - 2021 |
National |
Completed |
294 |
IGW |
Comprehensive Feasibility Study for Sustainable Restoration and Protection of Wetlands (Haor, baor, beel and connected rivers etc.) in Different Hydrological Regions of Bangladesh |
Bangladesh Haor & Wetlands Development Board |
2019 - 2021 |
National |
Completed |
295 |
CPI |
Developing Concept Design Solution for Coastal Erosion in Bangladesh |
CDR International B.V. |
2019 - 2020 |
National |
Completed |
296 |
ICT |
Sub Project of GIS and Mapping Support for DWSNIP of DWASA (Main project of P52146 of WRP |
SA Engineering |
2019 - 2022 |
National |
Completed |
297 |
CPI |
Feasibility Study for Protection and Development of Cox's Bazar Sea Beach |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
298 |
WSU |
Emergency Multi-Sector Rohingya Crisis Response Project (EMCRP) |
Department of Public Health |
2019 - 2022 |
National |
Completed |
299 |
SDT |
Emergency Bathymetric Survey of lower Meghna river at Char Folkon in Upazila : Komolnagar, District : Lakshmipur |
Bangladesh Water Development Board |
2019 - 2019 |
National |
Completed |
300 |
CPI |
Feasibility Study for Restoration of Sangu and Matamuhuri River Basin |
Bangladesh Water Development Board |
2019 - 2021 |
National |
Completed |
301 |
CCE |
(Sub-project of 52151 for CCC) -Climate Change Projection for Strategic Implementation of BDP-2100 (SIBDP) |
Stichting Deltares |
2019 - 2022 |
National |
Completed |
302 |
WSU |
ESIA and ESMF for the PRIDE Project, Mirersharai |
Bangladesh Economic Zone Authority |
2019 - 2022 |
National |
Completed |
303 |
SDT |
Bathymetric Survey by Multibeam Echosounder for monitoring Bank erosion and River training works at Noria. |
Bangladesh Water Development Board |
2019 - 2019 |
National |
Completed |
304 |
CPI |
Selection of suitable location for Installation of 33KV Submarine Cable in Kutubdia Channel to transmit power supply in Kutubdia Island under PDSD,Chattogram Zone (2nd Phase) |
Power Development Board |
2019 - 2020 |
National |
Completed |
305 |
RME |
Mathematical Modelling for New Rail Line from Modhukhali to Magura |
Bangladesh Railway |
2019 - 2020 |
National |
Completed |
306 |
SDT |
Bathymetric survey and Discharge measurement during 2019 monsoon for FRERMIP |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
307 |
FRM |
Feasibility Study for Construction of Hydraulic Elevated Dam of BWDB |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
308 |
WSU |
Water Supply from Mohra to Mirersharai EZ |
Chittagong WASA |
2019 - 2021 |
National |
Completed |
309 |
ICT |
Consultancy Services for Updating the Resettlement Action Plan (RAP) and Development of an IT System for Improvement of Sylhet-Tamabil Road |
Good |
2019 - 2019 |
National |
Completed |
310 |
FRM |
MIKE HYDRO Basin Model Updating for Water Allocation Plan Study for Selangor State |
JPS Consultant, Malaysia |
2019 - 2019 |
National |
Completed |
311 |
WSU |
Plan Design & Supervision of Maritime University |
Bangabandhu Sheikh Mujibur Rahman Maritime University |
2019 - 2023 |
National |
Completed |
312 |
FRM |
Regional Models Updating and Validation for 2018 |
IWM |
2019 - 2020 |
National |
Completed |
313 |
SDT |
Implementation Support Services in connection with different ongoing projects of BWDB |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
314 |
RME |
Hydro-morphological Modelling for the Buriganga & Meghna Rivers - Container Terminals at Pangaon and Ashuganj |
Design Development & Construction |
2019 - 2019 |
National |
Completed |
315 |
RME |
Mathematical Modelling for Dredging of the Padma River in Dohar Upazilla |
Bangladesh Army |
2019 - 2021 |
National |
Completed |
316 |
CPI |
Feasibility Study of Hilly Rivers for Integrated Solutions |
BanglaDesh Inter-water Transport Authority |
2019 - 2020 |
National |
Completed |
317 |
CPI |
Feasibility Study for Establishing the Linkage of the Upper Bhairab River with Mathabanga River for Restoration of Dry Season Flow |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
318 |
CCE |
Groundwater Rejuvenation As Climate change Resilience for marginalized and gender sensitive Ganges (GRACERS) |
International Institute |
2019 - 2021 |
National |
Completed |
319 |
DED, Opn |
Design vetting of 10 nos. of sluice gate and road embankment under the project "Construction of road from Kalurghat to Chaktai khal along the bank of Karnaphuly river by CDA |
Chittagong Development Authority |
2019 - 2019 |
National |
Completed |
320 |
CPI |
Development of Cox's Bazar Airport - Additional Hydrological and Morphological Study for the further extension of Cox's Bazar |
Civil Aviation Authority of Bangladesh |
2019 - 2019 |
National |
Completed |
321 |
WSU |
Consultancy Services for pre-work and post-work survey and analysis of 5-khals under Dhaka WASA |
Dhaka Water Supply and Sewerage Authority |
2019 - 2020 |
National |
Completed |
322 |
CPI |
Support to the Implementation of the Bangladesh Delta Plan 2100. |
Twynsta Gudde |
2019 - 2022 |
National |
Completed |
323 |
WSU |
Road and drainage improvement in zone 1-5 of GCC |
Gazipur City Corporation |
2019 - 2022 |
National |
Completed |
324 |
CPI |
Supervision and Monitoring the Performance of Dredging, Morphological and Environmental Impacts, Detailed Design and Assessment of Effectiveness of Dredging |
BanglaDesh Inter-water Transport Authority |
2019 - 2026 |
National |
On Going |
325 |
WSU |
Pre and Post-work Measurement for Sludge Removal of 11 khals in Dhaka city |
Dhaka Water Supply and Sewerage Authority |
2019 - 2019 |
National |
Completed |
326 |
WSU |
Sabrang/ Naf tourism park water assessment |
Bangladesh Economic Zone Authority |
2019 - 2021 |
National |
Completed |
327 |
SDT |
Bathymetric Survey at Bangladesh Magnama CCPP Project |
None |
2019 - 2019 |
National |
Completed |
328 |
IGW |
Groundwater-Surface Water Interaction Modelling and Hydrogeological Investigation for Conversion of 150 MW Sylhet GT to 225 MW CCPP Project |
Shanghai Electric Group Co. Ltd |
2019 - 2019 |
National |
Completed |
329 |
CPI |
Mathematical Model Study for Integrated Development and Sustainable Management Plan of Lower Meghna River Along Bhola Island |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
330 |
WSU |
Project Pre-feasibility study of Netrokona EZ |
Bangladesh Economic Zone Authority |
2019 - 2020 |
National |
Completed |
331 |
WSU |
Integrated WRM in Bangladesh - TA |
The World Bank |
2019 - 2019 |
National |
Completed |
332 |
CPI |
Mathematical Model Study for Integrated Development and Sustainable Water Management of Tentulia River |
Bangladesh Water Development Board |
2019 - 2019 |
National |
Completed |
333 |
RME |
Bahadurpur and Kernal Khal Bridges - Hydro-morphological Study |
Good |
2019 - 2019 |
National |
Completed |
334 |
CPI |
Joint Cooperation Programme for Bangladesh |
Stichting Deltares |
2019 - 2022 |
National |
Completed |
335 |
RME |
Monitoring of the Jamuna River for the Safety of RTWs of Bangabandhu Bridge during 2018 to 2022 |
Bangladesh Bridge Authority |
2019 - 2024 |
National |
Completed |
336 |
WSU |
Training, GIS Data Preparation & Mapping, Prepare Survey Report, Modelling and Detailed Design for the Contract Package ICB 02.9 of DWSNIP |
SA Engineering |
2019 - 2022 |
National |
Completed |
337 |
WSU |
Drainage Study of Chinese Economic Zone |
China Harbour |
2019 - 2019 |
National |
Completed |
338 |
WSU |
Updating of FS of Singair Phase 2 |
Dhaka Water Supply and Sewerage Authority |
2019 - 2019 |
National |
Completed |
339 |
CPI |
Water Management Knowledge and Innovation Program 2019 |
Stichting Deltares |
2019 - 2019 |
National |
Completed |
340 |
RME |
Munshirhat Bridge on the Kirtinasha River - Hydro-morphological Study |
Good |
2018 - 2019 |
National |
Completed |
341 |
SDT |
Prework survey for landfilling work at Sirajganj |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
342 |
FRM |
Support to SIBDP-2100 (CPE) |
Gazipur City Corporation |
2018 - 2022 |
National |
Completed |
343 |
IGW |
Aquifer Mapping and Groundwater Resource Assessment using Mathematical Modelling Technique |
Bangladesh Agriculture Development Corporation |
2018 - 2020 |
National |
Completed |
344 |
FRM |
Data collection and updating of Regional Models for 2017 |
IWM |
2018 - 2019 |
National |
Completed |
345 |
WSU |
Design and supervisn of drainage system in Zone 1 & 2 in Dhaka city |
Dhaka Water Supply and Sewerage Authority |
2018 - 2021 |
National |
Completed |
346 |
WSU |
Hydrogeological Investigation and Groundwater Modelling for Assessment of Groundwater Resources at Sirajganj Power Plant Area |
SDCI (Bangladesh) Limited |
2018 - 2018 |
National |
Completed |
347 |
CPI |
Feasibility study for construction of walkway, Eco-park and others on the foreshore land of the river Buriganga, Turag, Balu and Sitalakhya |
BanglaDesh Inter-water Transport Authority |
2018 - 2019 |
National |
Completed |
348 |
ICT |
GIS based Interactive Election Assessment System (GIEAS) |
A2I PMO |
2018 - 2019 |
National |
Completed |
349 |
CPI |
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone |
Bangladesh Water Development Board |
2018 - 2022 |
National |
Completed |
350 |
SDT |
Bathymetric Survey for Gorai River Dredging and Bank Protection |
Bangladesh Water Development Board |
2018 - 2020 |
National |
Completed |
351 |
WSU |
ADB-PDF |
Dhaka Water Supply and Sewerage Authority |
2018 - 2026 |
National |
On Going |
352 |
ICT |
Development of Web-GIS Application Phase-III for BTRC |
Bangladesh Telecommunication Regulatory Commission |
2018 - 2019 |
National |
Completed |
353 |
SDT |
Survey Support for Kutubdia Energy Hub |
Jan De Nul NV, Belgium |
2018 - 2019 |
National |
Completed |
354 |
CCE |
Groundwater Resource Assessment and Impact of Climate Change in Coastal area |
Danish Hydraulic Institute |
2018 - 2021 |
National |
Completed |
355 |
WSU |
Pagla STP Supervision Project |
Dhaka Water Supply and Sewerage Authority |
2018 - 2022 |
National |
Completed |
356 |
RME |
Dhaka-Chittagong High-speed Railway Line - Hydro-morphological Study |
CRDC-Mazumder Enterprise Consortium |
2018 - 2019 |
National |
Completed |
357 |
ICT |
Development of Upazila Land Suitability Assessment and Crop Zoning System of Bangladesh |
Bangladesh Agriculture Research Council |
2018 - 2021 |
National |
Completed |
358 |
SDT |
Site Survey for Selection of Hydrometric Station |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
359 |
ICT |
"Sub-project for ICT-GIS division under P52037". |
- N/A - |
2018 - 2018 |
National |
Completed |
360 |
WSU |
TA for Detailed Design, Development of Service Option & Modality and Preparation of Detailed Project Report (DPR) of Water Supply Scheme to Implement in Thirty Towns of Bangladesh |
Department of Public Health |
2018 - 2019 |
National |
Completed |
361 |
FRM |
Modelling Study and Statistical Analysis for Determination of Hydrological Parameters at Selected Locations on the Rivers |
SMEC |
2018 - 2018 |
National |
Completed |
362 |
SDT |
Implementation Support Service in connection with different ongoing projects of BWDB during 2018-19 |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
363 |
WSU |
FS of Collection System of Dasherkandi STP |
Dhaka Water Supply and Sewerage Authority |
2018 - 2019 |
National |
Completed |
364 |
SDT |
Kutubdia Energy Hub-Bathymetric and Met Ocean Monitoring Survey |
HASKONING |
2018 - 2019 |
National |
Completed |
365 |
WSU |
Land use Master Plan for DSCC New Unions |
Dhaka South City Corporation |
2018 - 2019 |
National |
Completed |
366 |
WSU |
Preparation of Detail Design with BOQ of 17 Bridges in Demra, Dakhingaon, Nasirabad & Manda Union of DSCC |
Dhaka South City Corporation |
2018 - 2018 |
National |
Completed |
367 |
CPI |
Technical FS of Boro Char in the Meghna River at Ikhlaspur Union under Matlab North Upazila in Chandpur District |
Bangladesh Agriculture Development Corporation |
2018 - 2018 |
National |
Completed |
368 |
CPI |
River Modelling Study for Assessing the Impact of Slipway and Planning of Mitigation Measures |
Khulna Shipyard Limited |
2018 - 2018 |
National |
Completed |
369 |
RME |
Hydro-morphological Modelling and Survey of the Jamuna River for the Proposed Bangabandhu Rail Bridge |
JV of OCG-Chodai-DDC |
2018 - 2020 |
National |
Completed |
370 |
FRM |
Promoting Resilience through Index Insurance in Bangladesh |
OXFAM, GB |
2018 - 2018 |
National |
Completed |
371 |
WSU |
Consultancy Services for Pre and Post-work Measurement after Sludge Removal and Re-excavation of Selected Khals in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2018 - 2018 |
National |
Completed |
372 |
WSU |
Sewerage master plan and detail design of priority works in Sylhet City |
Sylhet City Corporation |
2018 - 2022 |
National |
Completed |
373 |
ICT |
Mapping and 3D Modelling for 13 Port Facilities Development:Sub-project under (P52033) |
- N/A - |
2018 - 2019 |
National |
Completed |
374 |
CPI |
Payra Port Capital Dredging - Technical Consultancy Support Services |
Payra Port Authority |
2018 - 2018 |
National |
Completed |
375 |
RME |
Mirgonj and Nehalgonj Bridges over the Arialkha River - Hydro-morphological Study |
Good |
2018 - 2018 |
National |
Completed |
376 |
CPI |
FS of port facilities for Khulna, Narsingdi, Barguna , Galachipa, Mongla, Meghna, Sunamganj, Tekerghat, Ghorashal, Kanchpur port, Mojuchowdhuryhat, Daudkandi-Bausia River Port |
Bangladesh Petroleum Corporation |
2018 - 2019 |
National |
Completed |
377 |
RME |
Bhanga to Payra Port Rail Line Construction - Hydro-morphological Study |
Bangladesh Railway |
2018 - 2021 |
National |
Completed |
378 |
SDT |
Collection of bed sample and grain size analysis for JDN |
Jan De Nul NV, Belgium |
2018 - 2018 |
National |
Completed |
379 |
WSU |
Environmental Assessment of DSIP |
Dhaka Water Supply and Sewerage Authority |
2018 - 2019 |
National |
Completed |
380 |
WSU |
Water Resource Potential Assessment of Ukhia and Teknaf Upazila Area, Cox's Bazar, Bangladesh |
WaterAid |
2018 - 2018 |
National |
Completed |
381 |
SDT |
Bathymetric Survey, Current and Sediment Measurement for Free FEED Project (Payra Part) |
Nippon Koei |
2018 - 2018 |
National |
Completed |
382 |
FRM |
Flood Management Planning in Bangladesh: Cooperation on Mathematical Model of Hydrology and Sediment |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
383 |
RME |
Premtala Bridge over Kirtinasha River and Kazirhat Bridge over branch of Arial Khan River - Hydro-morphological Study |
Good |
2018 - 2018 |
National |
Completed |
384 |
SDT |
Sitakunda Port - Surveys |
Design Development & Construction |
2018 - 2018 |
National |
Completed |
385 |
CPI |
Technical Feasibility Study of Embankment-cum-road and Water Management Systems for Economic Zone-4 at Sonadia-Ghotibhanga Islands, Moheskhali, Cox's Bazar |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
386 |
WSU |
Feasibility Study of Development of Safe Water Supply System in the newly added 16 unions of DNCC and DSCC |
Dhaka Water Supply and Sewerage Authority |
2018 - 2018 |
National |
Completed |
387 |
SDT |
Post work Hydrographic Survey for RTIP-II |
None |
2018 - 2018 |
National |
Completed |
388 |
WSU |
Water Availability & Demand Assessment of MICITY |
Bangladesh Economic Zone Authority |
2018 - 2020 |
National |
Completed |
389 |
CPI |
Water Management Knowledge and Innovation Program (WMKIP) |
Stichting Deltares |
2018 - 2019 |
National |
Completed |
390 |
FRM |
Mathematical Modeling & Survey Support for HFM&LIP during 2018 & 2019 |
Nippon Koei |
2018 - 2020 |
National |
Completed |
391 |
FRM |
Prediction of Vulnerable Reaches of Submersible Embankment for Erosion due to Wave in 14 no new Haor subprojects |
Nippon Koei |
2017 - 2018 |
National |
Completed |
392 |
SDT |
Bathymetric Survey and Bed material analysis for Matarbari Port Development Project |
Nippon Koei |
2017 - 2018 |
National |
Completed |
393 |
SDT |
Survey for Feasibility Study and Pre-FEED for Petrobangla LNG Terminal Project |
Nippon Koei |
2017 - 2018 |
National |
Completed |
394 |
SDT |
River Survey, Lower Bhadra, Khulna during November 2017 |
Blue Gold Program |
2017 - 2017 |
National |
Completed |
395 |
SDT |
Implementation Support Services in Connection with different ongoing projects of BWDB |
Bangladesh Water Development Board |
2017 - 2018 |
National |
Completed |
396 |
FRM |
Management Support to the Mathematical Modelling Centre (MMC) for Water Resources Research & Development under Water Resources Department, Government of Bihar |
Joint Venture |
2017 - 2025 |
National |
Completed |
397 |
SPB |
Urbanizing Deltas of the World (UDW) Workshop 2017 |
Netherlands Organisation for Scientific Research |
2017 - 2018 |
National |
Completed |
398 |
IGW |
Training on Development of Groundwater Model for Linggi River Basin using MIKE SHE |
NAHRIM |
2017 - 2017 |
National |
Completed |
399 |
WSU |
Groundwater study at Purbachal New Town Project |
The World Bank |
2017 - 2018 |
National |
Completed |
400 |
FRM |
Flood and Drainage Management Study at BSRM Plots, Mirsharai Chittagong |
None |
2017 - 2018 |
National |
Completed |
401 |
FRM |
Hydrological Study for a Water Reservoir Construction to Supply Water to the GPH Ispat Limited, Kumira, Sitakunda, Chittagong |
None |
2017 - 2018 |
National |
Completed |
402 |
ICT |
Development of Web-GIS Application Phase-II for BTRC |
Bangladesh Telecommunication Regulatory Commission |
2017 - 2018 |
National |
Completed |
403 |
WSU |
Review the technical design of water supply systems / service options for Municipal Towns of Bangladesh |
The World Bank |
2017 - 2017 |
National |
Completed |
404 |
RME |
Four Large Road Bridges in the SW Region of Bangladesh - Hydro-morphological Study |
International Institute |
2017 - 2018 |
National |
Completed |
405 |
FRM |
Collaboration between IWM and Tufts University, USA on Flood Forecasting |
None |
2017 - 2020 |
National |
Completed |
406 |
FRM |
Data Collection and Regional Models Updating for 2016-18 |
- N/A - |
2017 - 2018 |
National |
Completed |
407 |
WSU |
Consultancy Services for demarcation of RoW of raw water transmission pipeline of Saidabad WTP Phase III |
Dhaka Water Supply and Sewerage Authority |
2017 - 2018 |
National |
Completed |
408 |
WSU |
Design of water distribution system in Zilmil project area |
Dhaka Water Supply and Sewerage Authority |
2017 - 2024 |
National |
Completed |
409 |
CPI |
Feasibility Study for Restoration of Bhadra and Salta river along with adjacent polder (25, 26, 27/1, 27/2, 28/1 & 29) to removal of Drainage Congestion of Khulna District including ESIA) |
Bangladesh Water Development Board |
2017 - 2018 |
National |
Completed |
410 |
CPI |
Feasibility study for restoration of dry season flow through dredging in the Sangu, Matamuhuri and Kornofuli River for improvement of navigability, domestic water use and irrigation |
BanglaDesh Inter-water Transport Authority |
2017 - 2018 |
National |
Completed |
411 |
CPI |
Feasibility study for improvement of Ghagot, Bangshi, Banar Lower, Nagda, Zinai and Gomti rivers for restoration of dry season flow, navigability improvement, flood and erosion management |
BanglaDesh Inter-water Transport Authority |
2017 - 2018 |
National |
Completed |
412 |
RME |
Railway Bridge at Upstream of Bangabandhu Bridge over the Jamuna River - Hydro-morphological Study |
Design Development & Construction |
2017 - 2018 |
National |
Completed |
413 |
WSU |
Feasibility Study of Barapukuria Coal Mine Project 2 |
- N/A - |
2017 - 2018 |
National |
Completed |
414 |
IGW |
Groundwater Modelling for Barapukuria Coal Mine Area |
BCMCL |
2017 - 2018 |
National |
Completed |
415 |
CPI |
Pump Drainage Action Research for Polder 2 |
Stichting Deltares |
2017 - 2018 |
National |
Completed |
416 |
SDT |
Training on Echosounder and OBS 3A |
Military Institute of Science and Technology |
2017 - 2017 |
National |
Completed |
417 |
IGW |
Study of Interaction between Haor and River Ecosystem including Development of Wetland Inventory and Sustainable Wetland Management Framework |
Bangladesh Haor & Wetlands Development Board |
2017 - 2021 |
National |
Completed |
418 |
SDT |
River Survey, Lower Bhadra, Khulna |
Blue Gold Program |
2017 - 2017 |
National |
Completed |
419 |
CPI |
Blue Gold: Innovation and Action Research - Water Management |
Stichting Deltares |
2017 - 2017 |
National |
Completed |
420 |
SDT |
Hydrological Data collection at Matarbari for UREC |
Union Resources & Engineering Co. Ltd. |
2017 - 2017 |
National |
Completed |
421 |
CPI |
Hydrological Observation and Thematic Study on Storm Tide Influence |
Union Resources & Engineering Co. Ltd. |
2017 - 2017 |
National |
Completed |
422 |
WSU |
Shifting of utility lines for Dhaka elevated expressway |
Bangladesh Army |
2017 - 2021 |
National |
Completed |
423 |
CPI |
Environmental and Morphological Study for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
Rupantarita Prakritik Gas Company Limited |
2017 - 2019 |
National |
Completed |
424 |
ICT |
Mapping for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
- N/A - |
2017 - 2017 |
National |
Completed |
425 |
ICT |
Identification of Char Lands: Pumpkin against Poverty |
Practical Action, Bangladesh |
2017 - 2017 |
National |
Completed |
426 |
ED |
DABW Workshop 2017 |
Government of NetherLands |
2017 - 2017 |
National |
Completed |
427 |
SDT |
Current, Wave and Salinity Measurement for the Matarbari Port Development |
Nippon Koei |
2017 - 2017 |
National |
Completed |
428 |
WSU |
Improvement of drainage and road network in new areas of DNCC |
Dhaka |
2017 - 2017 |
National |
Completed |
429 |
IGW |
SDIP Phase II - Sustaining Groundwater Irrigation for Food Security in the Northwest Region of Bangladesh |
CSIRO |
2017 - 2020 |
National |
Completed |
430 |
WSU |
Uttara 3rd Phase Water Distribution System planning, design and supervision. |
Dhaka Water Supply and Sewerage Authority |
2017 - 2018 |
National |
Completed |
431 |
SDT |
Bathymetric Survey, Sea bed Sampling and SS Sampling and Analysis for the Matarbari Port Development |
Nippon Koei |
2017 - 2017 |
National |
Completed |
432 |
FRM |
Future plan study for West Gopalganj Integrated Water Management Project |
Bangladesh Water Development Board |
2017 - 2017 |
National |
Completed |
433 |
ED |
Learning Delta Asia Initiatives |
Bangladesh Water Partership |
2017 - 2018 |
National |
Completed |
434 |
WSU |
Research Partnership for Cities and Climate Change Project |
International Centre for Integrated Mountain Development |
2017 - 2019 |
National |
Completed |
435 |
CPI |
Feasibility Study for Construction of River Port at Nagarbari, Chilmari; modernization of Baghabari River Port and Construction and Placement of Special Type Terminal Pontoons |
BanglaDesh Inter-water Transport Authority |
2017 - 2017 |
National |
Completed |
436 |
FRM |
Water Resources Vulnerability and Security Assessment of the Yarlung Tsangpo-Brahmaputra Transboundary River Basin |
Yunnan University |
2017 - 2019 |
National |
Completed |
437 |
SDT |
Monitoring Kalni-Kushiyara (Phase-II) |
Bangladesh Water Development Board |
2016 - 2019 |
National |
Completed |
438 |
SDT |
Measurement at Payra Port-3rd Campaign |
Jan De Nul NV, Belgium |
2016 - 2016 |
National |
Completed |
439 |
ICT |
Digitization of Mouza Maps, Geo-referencing and Procurement of Satellite Image for Elevated Expressway |
Bangladesh Bridge Authority |
2016 - 2017 |
National |
Completed |
440 |
CPI |
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY FOR EXTENSION OF COX'S BAZAR AIRPORT |
Civil Aviation Authority of Bangladesh |
2016 - 2017 |
National |
Completed |
441 |
SDT |
Postwork Survey of Titas River at Titas Upazilla |
Local Government Engineering Department |
2016 - 2016 |
National |
Completed |
442 |
CPI |
HYDROLOGY AND MORPHOLOGICAL STUDY FOR EXTENSION OF COX'S BAZAR AIRPORT |
Civil Aviation Authority of Bangladesh |
2016 - 2017 |
National |
Completed |
443 |
IGW |
Study for Investigation of Groundwater and Surface Water Irrigation in Habiganj, Maulavibazar, Sylhet, Sunamganj, Netrokona and Kishorganj Districts |
Bangladesh Haor & Wetlands Development Board |
2016 - 2019 |
National |
Completed |
444 |
CPI |
WaterApp for Water Resources Management in polder 43/2B and Polder 31-part |
Stichting Deltares |
2016 - 2016 |
National |
Completed |
445 |
WSU |
Design and Implementation of Water Supply Network in Chandrima Model Town |
Dhaka Water Supply and Sewerage Authority |
2016 - 2017 |
National |
Completed |
446 |
WSU |
Reaching out - disaster crisis management in urban areas |
Airbus-UNS |
2016 - 2019 |
National |
Completed |
447 |
CPI |
Feasibility Study for Improvement and Restoration of Navigability for Seven Navigation Routes |
BanglaDesh Inter-water Transport Authority |
2016 - 2017 |
National |
Completed |
448 |
SDT |
Prework Survey for Dredging at Ilisha Ghat to Rajapur |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
449 |
SDT |
Current and Wave Measurement in the Sea near Kutubdia |
None |
2016 - 2017 |
National |
Completed |
450 |
CPI |
Monitoring the Performance of Dredging i/c Hydrological & Morphological Impact by Modelling and Effectiveness of Dredging |
Payra Port Authority |
2016 - 2018 |
National |
Completed |
451 |
SDT |
Topographic and Bathymetric survey of erosion prone area at Jahizzer Char |
Bangladesh Army |
2016 - 2016 |
National |
Completed |
452 |
SDT |
ADCP Measurement and Bed Sampling for Jan De Nul in connection with Payra Port Dredging |
Jan De Nul NV, Belgium |
2016 - 2017 |
National |
Completed |
453 |
WSU |
ESIA Study for Interim Water Supply Project of DWASA |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
454 |
WSU |
Preparation of Action Plan for Control of Pollution of Peripheral Rivers of Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
455 |
CPI |
Research on Assessment of effectiveness of Mangrove Forests for Coastal Protection against Cyclonic Storm Surge: Bangladesh |
The World Bank |
2016 - 2017 |
National |
Completed |
456 |
CPI |
Feasibility Study for Drainage Improvement in Bhabodah Area |
Bangladesh Water Development Board |
2016 - 2017 |
National |
Completed |
457 |
WSU |
Design of water lines and modelling for Uttara Phase III Apartment Project |
Dhaka Water Supply and Sewerage Authority |
2016 - 2017 |
National |
Completed |
458 |
SDT |
Hydrological Data Collection and "Model Simulation" in the Rabnabad Channel near khepupara |
Jan De Nul NV, Belgium |
2016 - 2016 |
National |
Completed |
459 |
RME |
Feasibility Study of Re-excavation of the Bhairab River flowing over Meherpur and Chuadanga Districts |
Bangladesh Water Development Board |
2016 - 2018 |
National |
Completed |
460 |
HRD |
Training to NAHRIM Professionals-2016 |
NAHRIM |
2016 - 2016 |
National |
Completed |
461 |
SPB |
DeltaCap |
Netherlands Embassy |
2016 - 2021 |
National |
Completed |
462 |
IGW |
National Water Balance Management System (NAWABS) bagi Lembangan Sungai Muda |
JPS Consultant, Malaysia |
2016 - 2016 |
National |
Completed |
463 |
CPI |
Techno-Economical Feasibility Study for Development of The Land at Payra Port by Dredging Chars, Shoals For Oil Refinery |
Bangladesh Petroleum Corporation |
2016 - 2017 |
National |
Completed |
464 |
WSU |
Feasibility Study and Detailed Design of Sylhet WTP Project |
Sylhet City Corporation |
2016 - 2017 |
National |
Completed |
465 |
CPI |
Feasibility Study for Improvement of the Navigability of Pussur Channel at Outer Bar Area |
Mongla Port Authority |
2016 - 2016 |
National |
Completed |
466 |
ICT |
Design and Development of HAOR MIS |
Nippon Koei |
2016 - 2017 |
National |
Completed |
467 |
CPI |
Techno-Economical Feasibility Study for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
Petrobangla |
2016 - 2016 |
National |
Completed |
468 |
SDT |
Field Survey to Support Plume Study for Coal Fired Power Plant at Munshiganj |
Orion Group |
2016 - 2016 |
National |
Completed |
469 |
SDT |
Survey of Meghna River adjacent to Bhola |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
470 |
ICT |
Updating and upgrading of SIMS, development of SIMS-Google, SIMS-WEB, SIMS-Mobile |
Bangladesh Water Development Board |
2016 - 2018 |
National |
Completed |
471 |
SDT |
Services for Review of the Physical Condition and Functionality of Existing Hydraulic Structures of BWDB |
Bangladesh Water Development Board |
2016 - 2017 |
National |
Completed |
472 |
WSU |
FS and EIA for Secondary Mains of Pagla STP |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
473 |
ICT |
Development of Web-GIS Application Phase-I for A2I, PMO |
A2I PMO |
2016 - 2016 |
National |
Completed |
474 |
SDT |
Post work survey of the Norosunda River during 2016 |
Local Government Engineering Department |
2016 - 2016 |
National |
Completed |
475 |
SDT |
Conducting discharge, water level and percolation Rate measurement at Mathbaria Pourashava |
Dhaka |
2016 - 2016 |
National |
Completed |
476 |
WSU |
Dhaka Eastern Bypass Study |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
477 |
WSU |
Drainage Study of Goranchatbari and Kalyanpur Catchments |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
478 |
RME |
Gumti River Dredging - Hydro-morphological Study |
Bangladesh Water Development Board |
2016 - 2018 |
National |
Completed |
479 |
IGW |
Detailed Feasibility Study with ESIA for Restoration of Water Resources around Baral River Basin |
Bangladesh Water Development Board |
2016 - 2019 |
National |
Completed |
480 |
CPI |
Study to prioritize the proposed inland waterways routes for dredging financing and to undertake detailed feasibility study bid packages. |
HASKONING |
2016 - 2016 |
National |
Completed |
481 |
SDT |
Topographic Survey and volume calculation of rehabilitation area (40 acre) for Elevated Expressway PPP Project |
Bangladesh Bridge Authority |
2016 - 2018 |
National |
Completed |
482 |
HRD |
Training on Building Capacity on Climate Change Adaption - BWP 2016 |
Bangladesh Water Partership |
2016 - 2016 |
National |
Completed |
483 |
FRM |
Flash Flood Forecasting & Desimination (IFAD) |
Bangladesh Water Development Board |
2016 - 2019 |
National |
Completed |
484 |
SDT |
Hydromorphological Survey at Sonapahar, Mir Sarai, Chittagong |
Energy |
2016 - 2017 |
National |
Completed |
485 |
SDT |
Topographic and Hydrographic Surveys under Second Rural Transport Improvement Project, RTIP-II (Package - R1) |
Design Development & Construction |
2016 - 2016 |
National |
Completed |
486 |
WSU |
Support to DHI Team for Hydrogeological Investigation in Matarbari, Kutubdia and Moheshkhali Areas |
None |
2016 - 2016 |
National |
Completed |
487 |
RME |
Road bridge on the Gorabhanga River - Hydro-morphological Study |
Good |
2016 - 2016 |
National |
Completed |
488 |
WSU |
Sylhet City Drainage Study |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
489 |
FRM |
Regional Training Program for Scaling up of Satellite assisted Flood Forecasting Systems in South and Southeast Asian Nations |
None |
2016 - 2018 |
National |
Completed |
490 |
WSU |
Dhaka Eastern Bypass and Drainage Improvement Study by the World Bank |
The World Bank |
2016 - 2016 |
National |
Completed |
491 |
ICT |
Updating and upgrading of SIMS, development of SIMS-Google, SIMS-WEB, SIMS-Mobile |
Bangladesh Water Development Board |
2015 - 2018 |
National |
Completed |
492 |
RME |
Hydro-Morphological Study, IEE & EIA for Construction of Bridge over the River Korotoa under Pirganj Upazila of Rangpur |
Local Government Engineering Department |
2015 - 2016 |
National |
Completed |
493 |
SDT |
Land and Hydrological Survey for Forecast Based Finance Project Survey |
FAO |
2015 - 2016 |
National |
Completed |
494 |
IGW |
Cropping system intensification in the salt-affected coastal zones of Bangladesh and West Bengal, India |
ACIAR |
2015 - 2019 |
National |
Completed |
495 |
IGW |
Study for Upgrading and Rehabilitation of Karnafuli and other Irrigation Projects with ESIA in Hathazari, Rauzan Rangunia, Boalkhali and Fatikchari Upazillas in Chittagong District |
Bangladesh Water Development Board |
2015 - 2018 |
National |
Completed |
496 |
RME |
Hydro-morphological Study to Save the Guide Bund at Barisal End of the Dwarika Bridge on the Sugandha River |
Good |
2015 - 2016 |
National |
Completed |
497 |
SDT |
Topographic Survey for Matarbari Coal Power |
Nippon Koei |
2015 - 2015 |
National |
Completed |
498 |
RME |
Review and Re-design of BPW of Proposed Dharla Bridge in Phulbari Upazilla of Kurigram District |
Local Government Engineering Department |
2015 - 2016 |
National |
Completed |
499 |
SDT |
Topographic and Hydrographic Survey at Moheshkhali |
STEAG Energy Services (India) Pvt. Ltd. |
2015 - 2015 |
National |
Completed |
500 |
RME |
Bridges on the Titas and Pagla Rivers - Hydro-morphological Study |
Good |
2015 - 2016 |
National |
Completed |
501 |
SDT |
Water Quality Sampling for Matarbari Power Plant |
Fichtner-NHC JV |
2015 - 2015 |
National |
Completed |
502 |
CPI |
BIWTA: Environmental and Social Impact Assessment (ESIA) Study for Navigation Improvement of Selected Routes |
BanglaDesh Inter-water Transport Authority |
2015 - 2016 |
National |
Completed |
503 |
WSU |
Extension and rehabilitation of GW monitoring system in Dhaka |
Dhaka Water Supply and Sewerage Authority |
2015 - 2021 |
National |
Completed |
504 |
FRM |
Flood Hazard Model and Index Based Flood Insurance for South Asia with IWMI |
International Institute |
2015 - 2016 |
National |
Completed |
505 |
WSU |
Padma Ph-1 Distribution Strengthening |
Dhaka Water Supply and Sewerage Authority |
2015 - 2015 |
National |
Completed |
506 |
FRM |
Index-based Flood Insurance Coverage for 2015 |
OXFAM, GB |
2015 - 2015 |
National |
Completed |
507 |
RME |
Road Bridge on the Old Brahmaputra River - Hydro-morphological Study |
Good |
2015 - 2015 |
National |
Completed |
508 |
CPI |
Monitoring of Sedimentation, Salinity, Tide & Flood in Kobadak River System & TRM Basin |
Bangladesh Water Development Board |
2015 - 2018 |
National |
Completed |
509 |
RME |
Mathematical Modelling Study and Hydraulic Design of Bundher Bazar Bridge Protection Work |
Mir Akhter Hossain Limited |
2015 - 2015 |
National |
Completed |
510 |
WSU |
Contract Package 2.7 of DESWSP - RFL |
None |
2015 - 2021 |
National |
Completed |
511 |
SDT |
Discharge measurement in the Andharmanik and Bura Gouranga River at Khepupara |
Dhaka |
2015 - 2015 |
National |
Completed |
512 |
SDT |
Hydro-morphological data collection and traffic survey for LGED |
Local Government Engineering Department |
2015 - 2015 |
National |
Completed |
513 |
RME |
Hydraulic and Morphological Study of the Ghorautra River around Mithamain Area in connection with Establishing Cantonment |
- N/A - |
2015 - 2016 |
National |
Completed |
514 |
CPI |
Transaction Advisory Services for Construction of Laldia Bulk Terminal - Bangladesh |
MMM Group Limited |
2015 - 2015 |
National |
Completed |
515 |
CPI |
Hydrological & Morphological Study for Installation of 33KV Submarine Cable from Chittagong to Swandip under Power Distribution System Development Project, Chittagong Zone |
Power Development Board |
2015 - 2016 |
National |
Completed |
516 |
SDT |
Bathymetric Survey for Gorai River Restoration Project from 2014-2017 |
Bangladesh Water Development Board |
2015 - 2017 |
National |
Completed |
517 |
RME |
Road Bridges over the Datbhanga and Jharkata Rivers - Hydrological and Morphological Study |
Good |
2015 - 2015 |
National |
Completed |
518 |
SDT |
Discharge Measurement at Six Location of Plasma Plus |
None |
2015 - 2015 |
National |
Completed |
519 |
FRM |
Mathematical Modelling and Topographic Survey for Haor Flood Management of JICA |
Nippon Koei |
2015 - 2017 |
National |
Completed |
520 |
SDT |
Bathymetric Survey at the outfall of the Sangu River |
Orion Group |
2015 - 2015 |
National |
Completed |
521 |
CPI |
Feasibility Study of Capital Dredging in Pussur River from Mongla Port to Rampal Power Plant. |
Mongla Port Authority |
2015 - 2017 |
National |
Completed |
522 |
CPI |
Preparation of DEM and Delineation of Hydrological Boundaries for Polder 2, 26 and 31 |
Euroconsult Mott MacDonald |
2015 - 2015 |
National |
Completed |
523 |
FRM |
Flood Hydrology Study of the Eastern Part of Dhaka Metropolitan Area |
Rajdhani Unnyan Kortripaksha |
2015 - 2016 |
National |
Completed |
524 |
HRD |
Training on Climate Change to BWP: 2015 |
Bangladesh Water Partership |
2015 - 2015 |
National |
Completed |
525 |
WSU |
Improved pumping system for DWASA |
Dhaka Water Supply and Sewerage Authority |
2015 - 2015 |
National |
Completed |
526 |
HRD |
Delta Alliance Workshop 2015 |
- N/A - |
2015 - 2015 |
National |
Completed |
527 |
HRD |
World Water Day 2015 Workshop |
- N/A - |
2015 - 2015 |
National |
Completed |
528 |
CPI |
The Study of River Bank Erosion Management in Polder 29, Khulna |
Blue Gold Program |
2015 - 2016 |
National |
Completed |
529 |
SDT |
Bathymetric and Hydraulic Survey for Matarbari Power Plant |
Design Development & Construction |
2015 - 2015 |
National |
Completed |
530 |
SDT |
Consultancy services for Post work measurement of 32 km excavated Norosunda River |
Local Government Engineering Department |
2015 - 2015 |
National |
Completed |
531 |
CPI |
Detailed Technical Feasibility Study for Integrated Development of Jahizzer Char |
Military Institute of Science and Technology |
2015 - 2016 |
National |
Completed |
532 |
HRD |
Training for NAHRIM Staffs at IWM |
NAHRIM |
2015 - 2015 |
National |
Completed |
533 |
IGW |
Updating of KAFCO Area Groundwater Assessment and Impact on Environment |
Under Ministry of Industry |
2015 - 2016 |
National |
Completed |
534 |
CPI |
Consultancy Services for a) Construction Supervision & Detailed Design, b) Preparation of EIA and c) Preparation and Implementation of RAP for CEIP-1 |
Bangladesh Water Development Board |
2015 - 2019 |
National |
Completed |
535 |
WSU |
Padma WTP |
Dhaka Water Supply and Sewerage Authority |
2015 - 2017 |
National |
Completed |
536 |
CPI |
Community water management for improved food security and livelihoods in the coastal polders |
International Rice Research Institute |
2015 - 2016 |
National |
Completed |
537 |
SDT |
Consultancy services for Quality Control of Protective Work of Cross Bars as per design and specification |
Bangladesh Water Development Board |
2015 - 2016 |
National |
Completed |
538 |
WSU |
Drainage and sanitation master plan for CWASA |
Chittagong WASA |
2015 - 2016 |
National |
Completed |
539 |
CPI |
The Study of the Stability of Jarirdona River |
CDSP |
2014 - 2015 |
National |
Completed |
540 |
WSU |
Feasibility Study of Rajshahi Water Treatment Plant |
Rajshahi Water Supply & Sewerage Authority |
2014 - 2015 |
National |
Completed |
541 |
CPI |
Feasibility Study on Cluster of Chars (Dhal, Kola Toli and Mozammel) |
Euroconsult Mott MacDonald |
2014 - 2015 |
National |
Completed |
542 |
CPI |
Assessment of potential effect of surface water withdrawal in the Delta region on water flow and salinity level considering various climate change scenarios. |
CIMMYT, Mexico |
2014 - 2016 |
National |
Completed |
543 |
HRD |
Workshop/Conference on Integrated flood management with focus on coastal zones of Bangladesh. |
Bangladesh Water Partership |
2014 - 2014 |
National |
Completed |
544 |
RME |
Morphological Mathematical Modelling for Implementation Support to Maintenance Dredging of the Gorai River for Three Years (2014-16) under Gorai River Restoration Project, Phase II |
Bangladesh Water Development Board |
2014 - 2017 |
National |
Completed |
545 |
CPI |
Improving Adaptation against coastal vulnerability and enhancing flood forecasting skill through a satellite data integrating modeling framework in changing climate |
National Academy of Sciences |
2014 - 2016 |
National |
Completed |
546 |
WSU |
Joint research on 'Institutions for Urban Poor's Access to Ecosystem Services: A Comparison of Green and Water Structures in Bangladesh and Tanzania' |
None |
2014 - 2015 |
National |
Completed |
547 |
WSU |
Rainwater harvesting for artificial recharge |
Dhaka Water Supply and Sewerage Authority |
2014 - 2017 |
National |
Completed |
548 |
FRM |
Study for Islamic Relief |
Islamic Relief, Bangladesh |
2014 - 2016 |
National |
Completed |
549 |
FRM |
Development of water management model for Selangor and Langat River Basin of Malaysia using MIKE BASIN |
NAHRIM |
2014 - 2017 |
National |
Completed |
550 |
SDT |
Bathymetric Survey in the Padma River at Mawa Ghat during August 2014 |
Bangladesh Bridge Authority |
2014 - 2014 |
National |
Completed |
551 |
SDT |
BM Establishment for 12 Blue Gold Polder |
Dhaka |
2014 - 2014 |
National |
Completed |
552 |
CPI |
Planning, Design and Monitoring of Community Based Water Management System in Polder 30 for Blue Gold Program |
Blue Gold Program |
2014 - 2015 |
National |
Completed |
553 |
CPI |
Training on Hydrodynamic, Spectral Wave, Sand Transport Mod Transport Model by using Mike 21 Software |
NAHRIM |
2014 - 2014 |
National |
Completed |
554 |
WSU |
Drainage study of five khals in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2014 - 2014 |
National |
Completed |
555 |
ICT |
Web-GIS Based Salinity Information System |
The World Bank |
2014 - 2014 |
National |
Completed |
556 |
FRM |
Strengthening the Capacity of Satellite-based Flood Forecasting using Near Real-Time JASON-2 Satellite Altimeter Data |
International Centre for Integrated Mountain Development |
2014 - 2015 |
National |
Completed |
557 |
ICT |
Website Development for Bangladesh Water Partnership (BWP) |
Bangladesh Water Partership |
2014 - 2015 |
National |
Completed |
558 |
RME |
RBIP Numerical Modelling |
Fichtner-NHC JV |
2014 - 2014 |
National |
Completed |
559 |
RME |
RBIP Numerical Modelling - Supporting Study |
Fichtner-NHC JV |
2014 - 2014 |
National |
Completed |
560 |
IGW |
Mohananda River Dredging, Rubber Dam Study |
Bangladesh Water Development Board |
2014 - 2015 |
National |
Completed |
561 |
ICT |
Web-GIS Based Salinity Information System |
The World Bank |
2014 - 2014 |
National |
Completed |
562 |
ICT |
Mapping BRACs Presence through Geographical Information System (GIS) |
BRAC |
2014 - 2014 |
National |
Completed |
563 |
SDT |
Topographic and Bathymetric Survey of Kathalia River from Batakandi Bazar to Kathalia |
Dhaka |
2014 - 2014 |
National |
Completed |
564 |
FRM |
Sattelite based Flood Forecasting System at FFWC |
International Institute |
2014 - 2015 |
National |
Completed |
565 |
CPI |
BIWTA: Morphological Study, Design & Supervision and EIA/SIA of the Twelve Navigation Routes |
BanglaDesh Inter-water Transport Authority |
2014 - 2018 |
National |
Completed |
566 |
CPI |
Mapping Exercise on Water Logging in Southwest Region of Bangladesh |
FAO |
2014 - 2014 |
National |
Completed |
567 |
CPI |
Formulation of the Bangladesh Delta Plan 2100 |
Twynsta Gudde |
2014 - 2016 |
National |
Completed |
568 |
CPI |
Delta Plan 2100 |
Dhaka |
2014 - 2016 |
National |
Completed |
569 |
ICT |
Active Project 1 |
Bangladesh Water Development Board |
2014 - 2014 |
National |
Completed |
570 |
SDT |
Topographic Survey for Kanchpur, Meghna and Gumti 2nd Bridges Constrcution |
Dhaka |
2014 - 2014 |
National |
Completed |
571 |
SDT |
Hydrographic Survey for DWASA in the Meghna at Bishnondi |
Dhaka Water Supply and Sewerage Authority |
2014 - 2014 |
National |
Completed |
572 |
FRM |
Assess the Impacts of 40 acres Land Filling from BWDB Retention Ponding Area at Digun Mouza near Uttara Ph-3 |
None |
2014 - 2014 |
National |
Completed |
573 |
FRM |
Transboundary Data and Rainfall Prediction |
UNESCO-IHE |
2014 - 2015 |
National |
Completed |
574 |
HRD |
IWM-BWP Regional Workshop |
Bangladesh Water Partership |
2014 - 2014 |
National |
Completed |
575 |
SDT |
Hydrographic Survey for Padma Bridge during March 2014 |
Good |
2014 - 2014 |
National |
Completed |
576 |
SDT |
Miscellaneous field survey & equipment rental |
IWM |
2014 - 2014 |
National |
Completed |
577 |
SDT |
Hydrographic Survey for Feasibility Study for Integrated Development of Jahajer Char |
Military Institute of Science and Technology |
2014 - 2014 |
National |
Completed |
578 |
RME |
Updating of Final Report - Mathematical Model Study for Protection of Gaibandha District from Erosion of the Jamuna River |
Bangladesh Water Development Board |
2014 - 2014 |
National |
Completed |
579 |
SDT |
Topographic Survey for CYMMIT |
Dhaka |
2014 - 2014 |
National |
Completed |
580 |
CPI |
Bangladesh Coastal Vulnerability and Sea Level Rise Hazards |
Ohio State University |
2014 - 2016 |
National |
Completed |
581 |
SDT |
Topographic Survey of the NR Routes for Transmission pipe line of CWASA |
Dhaka |
2014 - 2014 |
National |
Completed |
582 |
FRM |
Hydraulic Study for determining design parameters of a connectivity channel of a housing development project for Bangladesh Police Officer. |
- N/A - |
2014 - 2014 |
National |
Completed |
583 |
SDT |
Hydrographic Survey for Orion Power Development at Munshiganj |
Orion Group |
2014 - 2014 |
National |
Completed |
584 |
SDT |
Hydrographic Survey for Orion Power Development at Khulna |
Orion Group |
2014 - 2014 |
National |
Completed |
585 |
FRM |
EU-Global Earth Observation for Integrated Water Resources Assessment (eartH2Observe) |
European Union |
2014 - 2017 |
National |
Completed |
586 |
WSU |
Integrated Water Project (Lot 1 and 3) in Turkey |
CarlBro |
2014 - 2015 |
National |
Completed |
587 |
FRM |
SDIS Project: Bangladesh Water Resource |
- N/A - |
2014 - 2014 |
National |
Completed |
588 |
WSU |
Jashaldia RAP Studies |
Dhaka Water Supply and Sewerage Authority |
2014 - 2016 |
National |
Completed |
589 |
SDT |
Quality Control and Impact assessment for 2nd Year Maintenance Dredging during 2013-14 under Capital Dredging Project |
Bangladesh Water Development Board |
2013 - 2015 |
National |
Completed |
590 |
CPI |
Bhola Erosion Management project-ORIOProgram |
HASKONING |
2013 - 2014 |
National |
Completed |
591 |
WSU |
Assessment of State of Water Resources, WARPO |
WARPO |
2013 - 2015 |
National |
Completed |
592 |
RME |
Technical Study to Judge the Feasibility of Installing Additional Jetty Structure at the River Bank of Surma River |
LAFARGE |
2013 - 2014 |
National |
Completed |
593 |
WSU |
Rural Water Supply Project. |
Local Government Engineering Department |
2013 - 2017 |
National |
Completed |
594 |
IGW |
Availability Study on Groundwater Resources for Selangor Water Management Authority |
LEMBAGA URUS AIR SELANGOR |
2013 - 2015 |
National |
Completed |
595 |
FRM |
Local Level Flood Forecasting (JAXA) |
Asian Development Bank |
2013 - 2015 |
National |
Completed |
596 |
SDT |
Bathymetric Survey and Monitoring for supporting Maintenance dredging of Gorai River Restoration Project (Phase-II) during 2013-14 |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
597 |
WSU |
Consultancy services for Network Analysis in Chittagong City |
Chittagong WASA |
2013 - 2021 |
National |
Completed |
598 |
WSU |
Study of Kalyanpur Regulating Pond |
Dhaka Water Supply and Sewerage Authority |
2013 - 2013 |
National |
Completed |
599 |
CPI |
Training Program on Hydrological, Hydrodynamic, Morphological, Salinity and Water Quality Model for Sungai Sarawak, Malaysia |
NAHRIM |
2013 - 2014 |
National |
Completed |
600 |
CPI |
Consultancy Services for Detailed Design, Social and Environmental Studies for Construction of Urir Char - Noakhali Cross-Dam Project (UCNCP) |
HASKONING |
2013 - 2014 |
National |
Completed |
601 |
RME |
Morphological Modelling for GRRP-II: One Year Extension 2013-14 |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
602 |
SDT |
Padma Bridge Bathymetric Survey during September 2013 |
Dhaka |
2013 - 2013 |
National |
Completed |
603 |
WSU |
Groundwater investigation for water supply to Chittagong city |
Chittagong WASA |
2013 - 2015 |
National |
Completed |
604 |
CPI |
Assessment of Erosion Vulnerability of East Bank of Meghna River and Re-location of the Proposed DS-3 in Noler Char |
CDSP |
2013 - 2013 |
National |
Completed |
605 |
SDT |
RTW Bathymetry Surveys and ADCP Measurement of Various Rivers in Support of RTW Hydrotechnical Investigations of Major Rivers |
Dhaka |
2013 - 2013 |
National |
Completed |
606 |
RME |
Monitoring of Hydraulic and Morphological Conditions of Jamuna River for the Safety of the RTW of Bangabandhu Bridge during the year 2013-2017 |
JMBA |
2013 - 2018 |
National |
Completed |
607 |
RME |
Rupsha River Mathematical Modeling Study for the Proposed Railway Bridge in connection with Khulna-Mongla Port Rail Line Project |
Design Development & Construction |
2013 - 2013 |
National |
Completed |
608 |
SDT |
Tidal Discharge Measurements and Suspended Sediment Sample Collection in Connection with the Feasibility Study of Char Maksumul Hakim Under CDSP-IV |
Design Development & Construction |
2013 - 2013 |
National |
Completed |
609 |
SDT |
Beel & Fish-Sanctuary Survey & Preparation of Inundation Maps of Fish Rings under Different Wave Level |
Malyasian Consultant |
2013 - 2013 |
National |
Completed |
610 |
FRM |
Increase of Flood Forecasting Stations within the Existing Network of Flood Forecasting Model for more Localised Flood Forecast under Research and Prediction Modelling |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
611 |
FRM |
IEE & EIA of Ashuganj 450 MW CCPP |
Dhaka |
2013 - 2013 |
National |
Completed |
612 |
CPI |
Training on Hydrodynamic, Wave & Mud Transport Modelling |
Malyasian Consultant |
2013 - 2013 |
National |
Completed |
613 |
IGW |
Survey & Investigation of Water Resources Management by Mathematical Modelling of Panchagarh, Thakurgaon, Dinajpur and Joypurhat Integrated Agriculture Development Project |
N/A |
2013 - 2015 |
National |
Completed |
614 |
CPI |
Effects of Climate Change on hydrology, water management and salinity of selected Sorjan systems and resilient measures in the southwest coastal area of Bangladesh |
Challenge Program on Water and Food |
2013 - 2014 |
National |
Completed |
615 |
CPI |
Techno-Economic Feasibility study for 3rd Sea Port at Robnabad Channel, Patuakhali |
Chittagong Port Authority |
2013 - 2013 |
National |
Completed |
616 |
WSU |
Saidabad WTP, Phase-III |
Dhaka Water Supply and Sewerage Authority |
2013 - 2015 |
National |
Completed |
617 |
ICT |
Basic GIS Training on ArcGIS 10 for SOBs professional |
Survey of Bangladesh |
2013 - 2013 |
National |
Completed |
618 |
CPI |
Mathematical Modelling and Technical Feasibility Study for Planning and Design of Erosion Mitigation Measures of BIJBardahnKhamar at Char Banshbaria, Dasmina |
BanglaDesh Inter-water Transport Authority |
2013 - 2013 |
National |
Completed |
619 |
WSU |
Floodplain wetland study in the Ganges-Brahmanputra basin |
- N/A - |
2013 - 2014 |
National |
Completed |
620 |
CPI |
Heat Dispersion and morphological Modelling for Ashuganj Power Plant |
Danish Hydraulic Institute |
2013 - 2013 |
National |
Completed |
621 |
CPI |
Assessment of Sea Level Rise and Vulnerability in the Coastal Zone of Bangladesh through Trend Analysis |
CEGIS |
2013 - 2015 |
National |
Completed |
622 |
SDT |
Groundwater Level Measurement, Sampling, Monitoring and RL Survey in the Coastal Area of Bangladesh (Extension) |
Department of Public Health |
2013 - 2013 |
National |
Completed |
623 |
FRM |
Establishment of Regional Flood Information system under HKH-HYCOS of ICIMOD |
International Institute |
2013 - 2014 |
National |
Completed |
624 |
CPI |
Char Development and Settlement Project–IV (CDSP-IV). |
CDSP |
2013 - 2013 |
National |
Completed |
625 |
RME |
Mathematical Morphological Modelling of the Jamuna River in Connection with the Proposed Power Plant in Sirajganj |
LANCO International Pte Ltd |
2013 - 2013 |
National |
Completed |
626 |
WSU |
Routine Inundation Mapping and Rainfall Monitoring in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2013 - 2014 |
National |
Completed |
627 |
RME |
Feasibility Study for the Re-Excavation of Titas River (Upper) under Brahmanbaria District |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
628 |
SDT |
Inventory, X-Section Survey and survey of farmers canal system of the Muhuri Irrigation Project |
Asian Development Bank |
2013 - 2014 |
National |
Completed |
629 |
FRM |
Flood Modeling for ADB funded project of Main River and Bank Erosion Management |
Dhaka |
2013 - 2013 |
National |
Completed |
630 |
SDT |
Survey of 16 Rivers for FSCD in c/w Capital Dredging Project |
Dhaka |
2013 - 2014 |
National |
Completed |
631 |
WSU |
Design Review and Supervision of wellfield in Tetulkhara-Bhakurta |
Dhaka Water Supply and Sewerage Authority |
2013 - 2016 |
National |
Completed |
632 |
CPI |
EIA of the proposed dredging project at the outer bar area of Pussur Channel |
Mongla Port Authority |
2012 - 2013 |
National |
Completed |
633 |
RME |
Golachipa, Bhandaria and Babuganj Bridges - Mathematical Hydro-morphological Modelling |
Dhaka |
2012 - 2013 |
National |
Completed |
634 |
RME |
Betagi Bridge - Mathematical Hydro-morphological Modelling |
Dhaka |
2012 - 2013 |
National |
Completed |
635 |
FRM |
JICA Data collection Survey on WRM in Haor Areas of Bangladesh |
Dhaka |
2012 - 2013 |
National |
Completed |
636 |
ICT |
Website Design, Development and Maintenance for the Office of Flood Forecasting and Warning Centre (FFWC), BWDB |
Bangladesh Water Development Board |
2012 - 2014 |
National |
Completed |
637 |
RME |
Bekutia Bridge - Mathematical Hydro-morphological Modelling |
Dhaka |
2012 - 2013 |
National |
Completed |
638 |
SDT |
Survey for dredging at Lafarge Surma Cement Ltd. Jetty and Ferry Pontoon area at Chattak during Nov'02 |
LAFARGE |
2012 - 2012 |
National |
Completed |
639 |
WSU |
India-Bangladesh Joint Research on Wetlands Trends & Status |
None |
2012 - 2013 |
National |
Completed |
640 |
IGW |
Hydrogeological Study & Groundwater Modelling for Barapukuria Coal Mine Area |
BCMCL |
2012 - 2014 |
National |
Completed |
641 |
CPI |
Quick assessment of Dhaka and coastal polder sub-sidence |
- N/A - |
2012 - 2013 |
National |
Completed |
642 |
FRM |
Hydrological Study of Tipai Mukh |
JRC |
2012 - 2018 |
National |
Completed |
643 |
SDT |
Quality control and Monitoring of Pilot Dredging of Jamuna River from Sirajganj Hardpoint to Dhaleswari Offtake (20 Km) (2nd year maintenance dredging) |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
644 |
FRM |
Flood Risk Management for Cagayan De Oro River in Philippine |
International Institute |
2012 - 2013 |
National |
Completed |
645 |
CPI |
TRAINING ON SEDIMENT TRANSPORT MODELING FOR SG. LUI, SELANGOR, MALAYSIA |
NAHRIM |
2012 - 2012 |
National |
Completed |
646 |
SDT |
Training of RBPP |
Bangladesh Water Development Board |
2012 - 2012 |
National |
Completed |
647 |
FRM |
Developing Alternative Risk Transfer Mechanism of Disaster & Climate Vulnerable Communities |
OXFAM, GB |
2012 - 2014 |
National |
Completed |
648 |
RME |
2nd Bhairab and Titas Bridges - Hydro-morphological Study |
Dhaka |
2012 - 2012 |
National |
Completed |
649 |
IGW |
Preparing the Bagmati River Basin Improvement Project in Nepal |
Danish Hydraulic Institute |
2012 - 2013 |
National |
Completed |
650 |
CPI |
Coastal Hydraulic and Morphological Study for Protection of Marine-drive |
Good |
2012 - 2014 |
National |
Completed |
651 |
WSU |
Study on Water logging of Greater Dhaka Area in a Changing Climate: Potential Damage and Adaptation |
The World Bank |
2012 - 2014 |
National |
Completed |
652 |
CPI |
Feasibility Study for Drainage Improvement of Polder 1,2 & 6-8 by Mathematical Modelling under the Satkhira District. |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
653 |
SDT |
Bathymetric Survey at Kushiyara River near North Pad BYGP during 2012 |
Chevron Bangladesh |
2012 - 2013 |
National |
Completed |
654 |
CPI |
Feasibility Study for Rehabilitation of Polder 36/1 Using Model Technique (Math Model) |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
655 |
RME |
Mathematical Model Study of Norosunda River |
Local Government Engineering Department |
2012 - 2012 |
National |
Completed |
656 |
CPI |
Mathematical Modelling Study of Excavation of Pilot Channel of the D/S of Feni Regulator |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
657 |
FRM |
Kalni-Kushiyara Dredging Modelling & Monitoring |
Bangladesh Water Development Board |
2012 - 2016 |
National |
Completed |
658 |
SDT |
BUET: Discharge Measurement at Siddirgonj (2nd Time) |
Bangladesh University of Engineering & Technology |
2012 - 2012 |
National |
Completed |
659 |
SDT |
Additional Hydrographic and Topographic Survey at proposed Bekutia Bridge, Pirojpur |
Dhaka |
2012 - 2012 |
National |
Completed |
660 |
SDT |
Ground water monitoring for JAR |
Department of Public Health |
2012 - 2012 |
National |
Completed |
661 |
CPI |
Malaysia: HYDRAULIC and Salinity MODELLING for THE DETAILed DESIGN OF ALL WORKS RELATED TO "LENCONGAN BANJIR BARAT TIMAH TASOH", PERLIS |
Malyasian Consultant |
2012 - 2012 |
National |
Completed |
662 |
FRM |
Flood Forecast and Inundation Modeling in Bagmati Adhwara Basin, India |
Danish Hydraulic Institute |
2012 - 2013 |
National |
Completed |
663 |
FRM |
Modernization and Integration of the Hydrology Network under BRIC |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
664 |
CPI |
Salinity Intrusion Modelling and development of salinity Information System |
The World Bank |
2012 - 2014 |
National |
Completed |
665 |
WSU |
DWASA: Dhaka Water Supply Master Plan Study |
Joint Venture |
2012 - 2013 |
National |
Completed |
666 |
SDT |
BUET: Discharge Measurement at Siddirgonj (1st Time) |
Bangladesh University of Engineering & Technology |
2012 - 2012 |
National |
Completed |
667 |
CPI |
Multi-hazard risk and vulnerability assessment modelling and mapping |
Disaster Management Bureau |
2012 - 2014 |
National |
Completed |
668 |
RME |
Bhangura - Nawgaon GCM Road Improvement - Hydrological & Hydraulic Study and EIA |
Local Government Engineering Department |
2012 - 2012 |
National |
Completed |
669 |
FRM |
Water availability, demand and adaptation option assessment of the Brahmaputra River Basin under climate change" |
Dhaka |
2012 - 2013 |
National |
Completed |
670 |
CPI |
Detailed Feasibility Study in connection with Protection of Ramgati and Kamal Nagar upazilla and adjacent areas under Laxmipur District from the continuing erosion of the Meghna River |
Bangladesh Water Development Board |
2012 - 2012 |
National |
Completed |
671 |
ADM |
Support to Wageningen University Research Center local office in Dhaka, Bangladesh |
- N/A - |
2011 - 2012 |
National |
Completed |
672 |
ICT |
Survey and mapping works of Ruppur NPP Project under Engineering land survey for the Feasibility Stage |
Bangladesh Atomic Energy Comission |
2011 - 2013 |
National |
Completed |
673 |
RME |
Bridge across Borobhanga River (Gap No. 25/1) at 25th Km of Sylhet-Sultanpur-Balagonj Road - Hydrological and Morphological Study with EIA |
Good |
2011 - 2012 |
National |
Completed |
674 |
SDT |
Survey for Lafarge Surma cement |
LAFARGE |
2011 - 2011 |
National |
Completed |
675 |
WSU |
Future Assessment of Water Resources in Bangladesh |
International Institute |
2011 - 2015 |
National |
Completed |
676 |
SDT |
Pre-Feasibility Study to Restore the Environment of the Kaptai Lake |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
677 |
SDT |
Dredging of Surma-Baulai River System Improvement of existing Embkt & Drainage Channel by Using Math Model & State -of-the Art Survey Technique |
Bangladesh Water Development Board |
2011 - 2015 |
National |
Completed |
678 |
RME |
Gorai Offtake Management Mathematical Modelling Study |
HASKONING |
2011 - 2012 |
National |
Completed |
679 |
SDT |
Survey for Chevron at Bibyana during October 2011 |
Chevron Bangladesh |
2011 - 2011 |
National |
Completed |
680 |
CPI |
Feasibility Study for Drainage Improvement and Sustainable Water Management of Bhairab River Basin |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
681 |
FRM |
Support to JICA for Water Resources Development Projects in Meghna Basin' |
Dhaka |
2011 - 2012 |
National |
Completed |
682 |
CPI |
IRRI: Increasing the Resilience of Agricultural and Aquaculture Systems in the Coastal Area of Ganges Delta |
- N/A - |
2011 - 2014 |
National |
Completed |
683 |
RME |
Mathematical Modelling in connection with Preparation of Master Plan for Ashuganj Power Station |
Dhaka |
2011 - 2012 |
National |
Completed |
684 |
ED |
Evaluation of IPSWAM Project |
Government of NetherLands |
2011 - 2011 |
National |
Completed |
685 |
CPI |
Bangla-Dutch research initiative on morphological assessment |
IWM |
2011 - 2014 |
National |
Completed |
686 |
SDT |
Topographic Survey for Road Bridge at Bekutia, Pirojpur |
Dhaka |
2011 - 2011 |
National |
Completed |
687 |
FRM |
Research with CSIRO, Australia on Integrated Water Resources Assessment in Bangladesh' |
Dhaka |
2011 - 2014 |
National |
Completed |
688 |
WSU |
IUCN Joint Research Project |
None |
2011 - 2011 |
National |
Completed |
689 |
FRM |
Bangla-Dutch Research Initiative on Flood Risk Management |
Government of NetherLands |
2011 - 2015 |
National |
Completed |
690 |
IGW |
Groundwater Resource study for 8 disricts of Rajshahi Divison, BMDA Phase -2 |
N/A |
2011 - 2014 |
National |
Completed |
691 |
CPI |
Feasibility Study for the Coastal Embankment Improvement Project |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
692 |
FRM |
Updating of O&M Manual of Teesta Barrage and it's CHR |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
693 |
CPI |
CGIAR-CPWF: Water governance and community based management |
International Institute |
2011 - 2014 |
National |
Completed |
694 |
CPI |
SW-KJDRP: Monitoring & Evaluation of the Hydrological & Morphological Conditions of Rivers & Drainage Problems of Beels in the KJDRP area for the Planning of Drainage Improvement Measures |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
695 |
SDT |
RRI: Collecting hydraulic and morphological data at the Upstream of the Bangabandhu Bridge |
River Research Institute |
2011 - 2011 |
National |
Completed |
696 |
SDT |
Collecting HYDROGRAPHIC SURVEYS IN THE JAMUNA AND PADMA NEAR BANGABANDHU BRIDGE & BARURIA |
Bangladesh Water Development Board |
2011 - 2015 |
National |
Completed |
697 |
FRM |
Upgrading of Flood Forecasting System under CDMP II |
Bangladesh Water Development Board |
2011 - 2014 |
National |
Completed |
698 |
IGW |
Package-3 Hydrological Study & Modelling |
Bangladesh Water Development Board |
2011 - 2015 |
National |
Completed |
699 |
IGW |
Package-1: Mathematical Modelling Study (Groundwater and Surface Water) |
Bangladesh Water Development Board |
2011 - 2014 |
National |
Completed |
700 |
IGW |
Package - 2 Math Modelling Saline Water Intrusion - MIS |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
701 |
ED |
Delta Alliance Bangladesh Wing: Networking, Research and Workshop |
- N/A - |
2011 - 2014 |
National |
Completed |
702 |
CPI |
Monotoring and Hydraulic Investigation for evaluation the performance of Navigation Improvement work of Mongla Port |
Mongla Port Authority |
2011 - 2015 |
National |
Completed |
703 |
RME |
Langalbandh - Naduria Ghat Road Bridge Hydrological & Morphological Study |
Good |
2011 - 2011 |
National |
Completed |
704 |
SDT |
Pre-monsoon bathymetric survey at the Kushiyara River near North Pad, Bibiyana Gas Plant |
Chevron Bangladesh |
2011 - 2011 |
National |
Completed |
705 |
CPI |
CPWF: Assessment of Impacts of anticipated external drivers of change on water resources of the coastal zone |
Challenge Program on Water and Food |
2011 - 2014 |
National |
Completed |
706 |
CPI |
Water Modelling for Sungai Langat basin ( river & ground water ) for water abstraction studies of Megasteel |
Zaaba SDN BHD |
2011 - 2011 |
National |
Completed |
707 |
SDT |
Hydrographic Survey in the Kocha River at Bekutia in the Pirojpur District |
Dhaka |
2011 - 2011 |
National |
Completed |
708 |
HRD |
Training to NAHRIM on Mike SHE and MIKE BASIN |
NAHRIM |
2011 - 2011 |
National |
Completed |
709 |
WSU |
National Hygiene Promotion Strategy for WSS' |
Department of Public Health |
2011 - 2011 |
National |
Completed |
710 |
RME |
Mathematical Modelling for Future Plan Development - After Excavation of Chandana-Barasia River |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
711 |
RME |
Narail - Kalia Bridge on the Naboganga River - Hydro-morphological Study |
Good |
2011 - 2011 |
National |
Completed |
712 |
CPI |
Sundarban: Bangladesh Climate Change Adaptation, Biodiversity Conservation & Sustainable Socio-Economic Development of the Sundarban Area- Non-lending Technical Asistance |
The World Bank |
2011 - 2012 |
National |
Completed |
713 |
RME |
Review of Location of the Proposed Matlab Bridge over the River Dhanagoda Matlab under Chandpur Road Division |
Good |
2011 - 2011 |
National |
Completed |
714 |
SDT |
Topographic Survey for Muhuri Irrigation Project |
Dhaka |
2011 - 2011 |
National |
Completed |
715 |
SDT |
West Gopalgonj IWMP |
Dhaka |
2011 - 2011 |
National |
Completed |
716 |
RME |
Kumarkhali - Jodu Boyra bridge on the gorai river- Hydrological & Morphological Modelling |
Good |
2011 - 2011 |
National |
Completed |
717 |
RME |
Mathematical Morphological Modelling in connection with Sustainable River Management Plan for Main Rivers, Distributaries and Tributaries in Bangladesh |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
718 |
RME |
Hydro-morphological Studies for LGED 9 Bridges in the SW Region |
Local Government Engineering Department |
2011 - 2013 |
National |
Completed |
719 |
FRM |
Support to FFWS for Pumpunga and Agno River Basins in Philippines |
Dhaka |
2011 - 2011 |
National |
Completed |
720 |
RME |
Morphological Study for the Selected Offtake in Connection with the Buriganga Augmentation Project |
Bangladesh Water Development Board |
2011 - 2016 |
National |
Completed |
721 |
SDT |
Quality control, Monitoring and Impact Assessment of Pilot Dredging of Jamuna River at 2 locations from Sirajganj Hardpoint to Dhaleswari Offtake (20 Km) and Near the Nalini Bazar (2 Km) |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
722 |
CPI |
Rehabilitation of Bhutiar beel and Barnal Salimpur Kolabashukhali FCD Project in Khulna District |
Bangladesh Water Development Board |
2010 - 2012 |
National |
Completed |
723 |
CPI |
Hydraulic Study for Planning and Design of Dredging of Chaplirdoon River using Mathematical Modelling |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
724 |
WSU |
Sewerage Master Plan of Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2010 - 2012 |
National |
Completed |
725 |
ICT |
National MIS for Water Supply & Sanitation Project |
Department of Public Health |
2010 - 2011 |
National |
Completed |
726 |
RME |
Mathematical Morphological Modelling for Kushiyara River near North Pad |
Chevron Bangladesh |
2010 - 2011 |
National |
Completed |
727 |
CPI |
ADB Aided- Port and Logistics Efficiency Improvement (Mongla & Benapole) |
Dhaka |
2010 - 2011 |
National |
Completed |
728 |
SDT |
Pre-Interim-Post Survey for dredging at Lafarge Surma Cement Ltd. Jetty area at Chattak |
LAFARGE |
2010 - 2010 |
National |
Completed |
729 |
CPI |
CDMP: Impact of Climate Change on salinity intrusion and zoning of salinity level for assessment of Community risk in the Coastal Area |
CDMP |
2010 - 2012 |
National |
Completed |
730 |
RME |
Hydro-morphological Study of the Korotoya River around Baradaha Bridge Location in Gaibandha |
Good |
2010 - 2011 |
National |
Completed |
731 |
SDT |
Hydrographic and Topographic Survey of the Kushiara River near Bibiyana Gas field during monsoon 2010 |
Chevron Bangladesh |
2010 - 2011 |
National |
Completed |
732 |
RME |
Monitoring of Hydraulic and Morphological Conditions for the Safety of the Jamuna Multipurpose Bridge for the Year 2011. |
JMBA |
2010 - 2012 |
National |
Completed |
733 |
IGW |
Joint Action Research on Salt Water Intrusion in Groundwater in the Coastal Area |
Danish International Development Agency |
2010 - 2014 |
National |
Completed |
734 |
FRM |
Hydro-morphological Study of Itna-Mithamain-Austagram Road under Kishoreganj District, |
Good |
2010 - 2012 |
National |
Completed |
735 |
FRM |
Drainage and Irrigation Improvement Study of Beel Gazna and Adjoining Areas of Pabna District |
Bangladesh Water Development Board |
2010 - 2016 |
National |
Completed |
736 |
FRM |
Mathematical Modelling Study of Sureswar FCDI Project |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
737 |
RME |
Morphological Mathematical Modelling for Planning, Design, Monitoring and Quality Control of Dredging for Gorai River Restoration Project, Phase II |
Bangladesh Water Development Board |
2010 - 2013 |
National |
Completed |
738 |
CPI |
Morphological Mathematical Modelling for Planning, Design, Monitoring and Quality Control of Sub-Project of CPE from REN:Dredging for Gorai River Restoration Project, Phase II (Dummy) |
Bangladesh Water Development Board |
2010 - 2013 |
National |
Completed |
739 |
CPI |
Cyclone-Induced Storm Surge Modelling and Assessment of Storm Surge Height for the Construction of Cyclone Shelter in the Coastal Region of Bangladesh |
Islamic Development Bank |
2010 - 2011 |
National |
Completed |
740 |
FRM |
Mathematical Modelling Study for Tarail Pachuria FCDI Project (Phase II) |
Bangladesh Water Development Board |
2010 - 2012 |
National |
Completed |
741 |
SDT |
Bathymetric Survey for Padma Bridge Design during 2010 monsoon |
Dhaka |
2010 - 2011 |
National |
Completed |
742 |
FRM |
Greater Mekong Sub-region Flood and Drought Risk Management and Mitigation Project |
Dhaka |
2010 - 2011 |
National |
Completed |
743 |
RME |
Mathematical Modelling of the Ganges in connection with the Proposed Rooppur Power Plant |
Bangladesh Atomic Energy Comission |
2010 - 2011 |
National |
Completed |
744 |
RME |
Rajbari Town Protection |
Bangladesh Water Development Board |
2010 - 2010 |
National |
Completed |
745 |
RME |
Mathematical Modelling Study for the Protection of the Padma Left Bank around Sreenagar and Dohar Upazilla |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
746 |
ICT |
MIS for S.W. Area IWRM |
DHV-Devcon-Kranti-DPMC |
2010 - 2011 |
National |
Completed |
747 |
RME |
Hydrological and Morphological Study and Supervision of Construction Works for 11 Nos. Bridges at Different Upazillas of Barishal, Pirozpur, Bhola and Jhalokati Districts Under GBDRCHBIDP |
Local Government Engineering Department |
2010 - 2011 |
National |
Completed |
748 |
RME |
Study of Impact of Dredging at 3.17km Upstream of Hardinge Bridge on the Ganges River |
Bangladesh Water Development Board |
2010 - 2010 |
National |
Completed |
749 |
CPI |
Effect of climate Change on Cholera Dynamics and Prediction (Research Project) |
- N/A - |
2010 - 2011 |
National |
Completed |
750 |
RME |
Road Bridge on Dhonagoda River at Motlab Thana under Chandpur District |
Good |
2010 - 2010 |
National |
Completed |
751 |
CPI |
Mathematical Modelling Study for Integrated Water Management Project of Polder 34/2 in Bagherhat Dist. |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
752 |
IGW |
Strengthening BMDA’s Capacity on Water Resources Management |
Local Government Engineering Department |
2010 - 2011 |
National |
Completed |
753 |
CPI |
Halda Water Modelling Study for Assessment of Sustainability of Restoration of Spawning Ground in the Halda River. |
Directorate of Fisheries |
2010 - 2011 |
National |
Completed |
754 |
FRM |
Gungaijuri Hoar FCD Project |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
755 |
WSU |
Khulna GW Study for Drinking Water Supply”. |
Asian Development Bank |
2010 - 2010 |
National |
Completed |
756 |
SDT |
Preliminary route survey for laying high pressure gas transmission pipeline |
Energy |
2010 - 2010 |
National |
Completed |
757 |
CPI |
Hydraulic Study for Chevron to support drilling rig at Char Kajol |
Chevron Bangladesh |
2010 - 2010 |
National |
Completed |
758 |
FRM |
Water Resources Development Project in SW Region under JICA |
Dhaka |
2010 - 2010 |
National |
Completed |
759 |
WSU |
Feasibility Study of Pagla WTP |
Dhaka Water Supply and Sewerage Authority |
2010 - 2011 |
National |
Completed |
760 |
RME |
Hydrological and Morphological Study for the Proposed Re-excavation of Old Madhumati River under Gopalganj District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
761 |
SDT |
Dry Season Topographic & Bathymetric Survey, South Bank for River Training Work of Padma Multipurpose Bridge Project |
Dhaka |
2010 - 2010 |
National |
Completed |
762 |
CPI |
Monitoring of drainage, salinity and sedimentation of Baggar Dona River Catchment area under CDSP-III |
CDSP |
2010 - 2011 |
National |
Completed |
763 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Gorai River at Kushtia Sadar Upazilla under Kushtia District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
764 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Karua Natunbazar Road over Someswari River at Sreebardi Upazila in Sherpur District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
765 |
RME |
Hydrological and Morphological Study for Planning and Design of 378.4m Bridge on the Gazaria-Manika via Dularhat-Anjurhat Road over Maya River at Charfassion Upazila in Bhola District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
766 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Bangshi River at Dhamrai Upazilla under Dhaka District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
767 |
FRM |
Application of Satellite Rainfall Estimation (SRE) in Hindu-Kush and Himalayan (HKH) Region |
IWM |
2010 - 2010 |
National |
Completed |
768 |
SDT |
Hydrographic Survey in the Tetulia at Char Kazal |
Dhaka |
2010 - 2010 |
National |
Completed |
769 |
WSU |
Water Supply, Drainage & Sanitation in 148 Pourashava |
Department of Public Health |
2010 - 2013 |
National |
Completed |
770 |
CPI |
On-the-job Training on Hydrodynamic and Morphological Model using MIKE 21 FM for NAHRIM Professionals |
NAHRIM |
2010 - 2010 |
National |
Completed |
771 |
FRM |
Development of flood forecasting model for Bagmati Basin, Nepal |
Dhaka |
2010 - 2011 |
National |
Completed |
772 |
WSU |
Dhaka Artificial Recharge, DWASA |
Dhaka Water Supply and Sewerage Authority |
2009 - 2011 |
National |
Completed |
773 |
WSU |
Ashulia Reservoir Study DWASA |
Dhaka Water Supply and Sewerage Authority |
2009 - 2010 |
National |
Completed |
774 |
SDT |
Survey for Design of Sandwip-Urir-Char-Noakhali Cross-dam under EDP |
CDSP |
2009 - 2010 |
National |
Completed |
775 |
FRM |
Modelling Study and Statistical Analysis to support Laksham-Chittagong Railway Line project |
Dhaka |
2009 - 2009 |
National |
Completed |
776 |
SDT |
Bathymetric Survey in connection with Dredging of Gorai River |
Bangladesh Water Development Board |
2009 - 2013 |
National |
Completed |
777 |
SDT |
Bathymetric Survey in connection with dredging of Gorai River |
Bangladesh Water Development Board |
2009 - 2013 |
National |
Completed |
778 |
WSU |
Kalyanpur Retention Pond Study |
Dhaka Water Supply and Sewerage Authority |
2009 - 2009 |
National |
Completed |
779 |
SDT |
Topographic Survey for earth filling work at the left bank of Karnaphuly River |
Local-Firm |
2009 - 2009 |
National |
Completed |
780 |
SDT |
Desk study on the transportation of heavy cargo from Chittagong port to Fenchuganj |
Under Ministry of Industry |
2009 - 2009 |
National |
Completed |
781 |
RME |
Hydrological and Morphological Study of Bangshi River and Dewali River for Construction of Bridges under Manikgonj |
Good |
2009 - 2010 |
National |
Completed |
782 |
FRM |
Climate Change Impact Assessment of Nepal |
- N/A - |
2009 - 2011 |
National |
Completed |
783 |
SDT |
Survey for Char Mainka Cross-dam Project under EDP |
Dhaka |
2009 - 2010 |
National |
Completed |
784 |
RME |
Hydrological and Morphological Study for the proposed Baniachong-Azmiriganj Road to connect Baniachong and Azmiriganj Upazilla under Habiganj District |
Good |
2009 - 2010 |
National |
Completed |
785 |
WSU |
DWASA WQ Monitoring & FS |
Dhaka Water Supply and Sewerage Authority |
2009 - 2010 |
National |
Completed |
786 |
RME |
Hydrological and Morphological Study for the proposed Road Bridge on Kushiara River Branch at Azmiriganj Upazilla under Habiganj District |
Good |
2009 - 2010 |
National |
Completed |
787 |
WSU |
Detail WQ Investigation for FS of Khulna Water Supply Project of JICA |
Dhaka |
2009 - 2010 |
National |
Completed |
788 |
CPI |
Impact of Climate Change and Sea Level Rise on Sungai Langat Estuary, Malaysia |
NAHRIM |
2009 - 2010 |
National |
Completed |
789 |
SDT |
Survey work at Surma River at Chattak at Lafarge Plant and Jetty Area |
LAFARGE |
2009 - 2009 |
National |
Completed |
790 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Karatoya River at Ullahpara Upazilla under Sirajganj District |
Good |
2009 - 2010 |
National |
Completed |
791 |
CPI |
Monthly Hydrodynamic Prediction for Chevron to Assist Seismic Survey |
Canarail |
2009 - 2009 |
National |
Completed |
792 |
FRM |
Assistance to CCA and DRR in the NE Region of Bangladesh |
Danish International Development Agency |
2009 - 2013 |
National |
Completed |
793 |
CPI |
Uttaron to prepare “Peoples Plan of Action for management of Rivers in Southwest Bangladesh |
Dhaka |
2009 - 2010 |
National |
Completed |
794 |
SDT |
Training of BWDB & EDP staffs on Hydrographic Survey under Estuary Development Programme |
Dhaka |
2009 - 2009 |
National |
Completed |
795 |
RME |
Padma Bridge Design Modelling |
HR Wallingford |
2009 - 2010 |
National |
Completed |
796 |
WSU |
Dhaka Water Supply ADB TA Project. |
Asian Development Bank |
2009 - 2016 |
National |
Completed |
797 |
CPI |
Monitoring the Effectiveness of the drainage system for removal of drainage problem in Noakhali Area |
Bangladesh Water Development Board |
2009 - 2010 |
National |
Completed |
798 |
SDT |
ADCP & Bathymetry Survey for Padma Bridge Project |
Dhaka |
2009 - 2014 |
National |
Completed |
799 |
WSU |
Ganges River Basin Modeling |
The World Bank |
2009 - 2010 |
National |
Completed |
800 |
SDT |
Cross section survey of the Kushiara River at near Bibiyana Gas Field, Sylhet |
Dhaka |
2009 - 2009 |
National |
Completed |
801 |
SDT |
Survey of the Ganges Barrage Project. |
Bangladesh Water Development Board |
2009 - 2011 |
National |
Completed |
802 |
WSU |
Mathematical Modelling for the Ganges Barrage Project |
Bangladesh Water Development Board |
2009 - 2016 |
National |
Completed |
803 |
FRM |
Index based flood insurance for Sirajgang District |
Dhaka |
2009 - 2009 |
National |
Completed |
804 |
IGW |
Groundwater Model Study for Rajshahi Barind Phase-III |
N/A |
2009 - 2012 |
National |
Completed |
805 |
CPI |
Economics of Adaptation to Climate Change- Bangladesh Case Study |
The World Bank |
2009 - 2010 |
National |
Completed |
806 |
FRM |
ADB: Strengthening the Resilience of the Water Sector in Khulna to Climate Change (Sub-Project of FMG) Dummy |
IWM |
2009 - 2010 |
National |
Completed |
807 |
FRM |
Economics of Adaptation to Climate Change- Bangladesh Case Study (Sub-Project of FMG Division) |
The World Bank |
2009 - 2009 |
National |
Completed |
808 |
WSU |
ADB: Strengthening the Resilience of the Water Sector in Khulna to Climate Change |
Asian Development Bank |
2009 - 2010 |
National |
Completed |
809 |
CPI |
ADB: Strengthening the Resilience of the Water Sector in Khulna to Climate Change (Sub-Project of CPE |
Asian Development Bank |
2009 - 2010 |
National |
Completed |
810 |
SDT |
Fixation of alignment for new road construction from Madani Avenue to Eastern By-Pass |
Rajdhani Unnyan Kortripaksha |
2009 - 2009 |
National |
Completed |
811 |
SDT |
Support to Pacific Marine Service in dredging of Outer bar area of Chittagong Port |
Local-Firm |
2009 - 2009 |
National |
Completed |
812 |
IGW |
KAFCO Area Groundwater Assessment and Impact on Environment |
Danish Hydraulic Institute |
2009 - 2009 |
National |
Completed |
813 |
ICT |
Resource Mapping in Teknaf and Ukhiya Upazilas |
UNICEF |
2009 - 2009 |
National |
Completed |
814 |
RME |
Juri River Bridge: Hydrological and morphological study for the bridge over the Juri River and road from Biyanbazar to Golapganj |
Good |
2009 - 2009 |
National |
Completed |
815 |
CPI |
Chevron: Coastal Hydraulic Study and Survey to Support Seismic Survey of Chevron |
Chevron Bangladesh |
2009 - 2009 |
National |
Completed |
816 |
RME |
Hydrological and Morphological study for the Kazi Bazar Bridge, Sylhet |
Good |
2009 - 2009 |
National |
Completed |
817 |
RME |
Gafargaon Bridge: Hydro-Morphological Study |
Local Government Engineering Department |
2009 - 2009 |
National |
Completed |
818 |
SDT |
River Bank Protection Monitoring at Kurigram |
Bangladesh Water Development Board |
2009 - 2010 |
National |
Completed |
819 |
WSU |
Portlink |
Port Link Ltd. |
2009 - 2010 |
National |
Completed |
820 |
WSU |
Monitoring and Assessment of Water Quality and Salinity of Modhumoti River |
None |
2009 - 2009 |
National |
Completed |
821 |
CPI |
Malaysia: Costal hydraulic and morphological study for Labuan Island |
NAHRIM |
2009 - 2009 |
National |
Completed |
822 |
WSU |
Geothermal Resource Exploration in Thakurgaon |
GTERM Limited |
2009 - 2011 |
National |
Completed |
823 |
WSU |
Geothermal Resource Exploration |
Geothermal Exploration Resource Management Ltd. |
2009 - 2011 |
National |
Completed |
824 |
IGW |
BADC: Flow assessment for Survey and Investigation of Minor Irrigation Improvement project Phase -2 |
Bangladesh Agriculture Development Corporation |
2009 - 2009 |
National |
Completed |
825 |
SDT |
Lafarge Surma Cement Ltd. Navigability Survey |
LAFARGE |
2009 - 2009 |
National |
Completed |
826 |
WSU |
HYSAWA Project, Phase-II for Noakhali Region |
Department of Public Health |
2009 - 2011 |
National |
Completed |
827 |
CPI |
Feasibility Study and Detailed Engineering Design for Long Term Solution of Drainage Problems in the Bhabadah Area |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
828 |
RME |
Lohalia River Bridge Hydrological & Morphological Study |
Local Government Engineering Department |
2008 - 2009 |
National |
Completed |
829 |
FRM |
Update of FFWC Super Model for 2007 |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
830 |
CPI |
Kobadak River Basin Drainage Management |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
831 |
FRM |
Baggardona drainage management Project (DUMMY for FMG Division) |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
832 |
SDT |
Survey of Jhilmil Project for Basic Dredging Co. Ltd |
Basic Dredging Co. Ltd. |
2008 - 2008 |
National |
Completed |
833 |
WSU |
Scheme Information Management System for WMIP |
Bangladesh Water Development Board |
2008 - 2014 |
National |
Completed |
834 |
IGW |
Conjunctive Use Potential of SW-GW for Malaysia |
Bureau of Innovation & Consultancy |
2008 - 2010 |
National |
Completed |
835 |
RME |
Sailabari Jamuna River Erosion Protection at Sirajgonj |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
836 |
CPI |
Update MES General 2D model for EDP |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
837 |
WSU |
Barisal Sylhet Water Supply, Drainge & sanitation Project |
Department of Public Health |
2008 - 2009 |
National |
Completed |
838 |
WSU |
Alleviation of Waterlogging Problems in Chaktai and Moheshkhali Khal Catchments |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
839 |
FRM |
Monitoring of Hydraulic Performance of Causeways in Khaliajuri FCD Project |
Bangladesh Water Development Board |
2008 - 2013 |
National |
Completed |
840 |
FRM |
Khatlon Province Flood Risk Management Project |
Bangladesh Engineering & Technology Servces |
2008 - 2013 |
National |
Completed |
841 |
CPI |
Survey and Modelling of Sandwip-UrirChar-Noakhali Cross dam |
Dhaka |
2008 - 2009 |
National |
Completed |
842 |
ICT |
Development of a Data Management System for Hardware and Water Quality (HAWQ) for UNICEF |
UNICEF |
2008 - 2009 |
National |
Completed |
843 |
CPI |
Hydraulic Modelling Study for Deep Sea port |
Dhaka |
2008 - 2008 |
National |
Completed |
844 |
CPI |
Baggardona drainage management Project |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
845 |
RME |
Sunamgonj Bridge at 1st km & Chhatk Bridge at 14th km of Gobindaganj-Chhatak-Dwarabazar Road on Surma River: Hydo-Morphological & EIA Study. |
Good |
2008 - 2009 |
National |
Completed |
846 |
FRM |
Flash Flood Forecasting in NE Region |
Care Bangladesh |
2008 - 2009 |
National |
Completed |
847 |
FRM |
Hydrological Modelling for Impact of Climate Change on Agriculture |
The World Bank |
2008 - 2008 |
National |
Completed |
848 |
RME |
Numerical Model study for investigation of erosion/deposition process and assessment of impact of bank protection of Jamuna River at PIRDP |
Dhaka |
2008 - 2010 |
National |
Completed |
849 |
SDT |
Topographical Survey for 450 MW power plant at Bibiyana, Habiganj |
Power Development Board |
2008 - 2008 |
National |
Completed |
850 |
IGW |
BADC: Feasibility Study for Augmentation of Flow for Supplementary Irrigation of Lalmonirhat district |
Bangladesh Agriculture Development Corporation |
2008 - 2008 |
National |
Completed |
851 |
SDT |
Current Measurement at Sonadia for Deep Sea Port |
Dhaka |
2008 - 2008 |
National |
Completed |
852 |
CPI |
“ Drainage and Sedimentation Study of Noler Char and Char Nangulia using Mathmatical Modlling” for the Char Development and Settlement Project –III (CDSP –III) |
Mott Mc |
2008 - 2008 |
National |
Completed |
853 |
FRM |
Mayakanan Lake City Mathematical Modelling |
Developer |
2008 - 2008 |
National |
Completed |
854 |
CPI |
Support to FFWC for CCA and DRR-Danida - Sub-Project for CPE Division |
Danish International Development Agency |
2008 - 2010 |
National |
Completed |
855 |
FRM |
Support to FFWC for CCA and DRR-Danida |
Danish International Development Agency |
2008 - 2011 |
National |
Completed |
856 |
IGW |
Math Modelling for Eng Design of KIP (North) |
HCL |
2008 - 2010 |
National |
Completed |
857 |
CPI |
Planning and Design of Beel Kapalia Tidal Basin for Tidal River Management (TRM) and Sustainable Drainage Improvement |
Bangladesh Water Development Board |
2008 - 2008 |
National |
Completed |
858 |
CPI |
Support to CWASA Water Supply Project (Dummy) |
Chittagong WASA |
2008 - 2008 |
National |
Completed |
859 |
WSU |
CWASA water supply project |
Chittagong WASA |
2008 - 2008 |
National |
Completed |
860 |
RME |
Monitoring of Hydraulic & Morphological Conditions for the safety of the JMB during 2008-09 |
JMBA |
2008 - 2010 |
National |
Completed |
861 |
CPI |
CDMP: Preparation of Tsunami and storm surge risk map |
Dhaka |
2007 - 2009 |
National |
Completed |
862 |
CPI |
CDMP: Disaster Management Web Portal for CDMP |
CDMP |
2007 - 2009 |
National |
Completed |
863 |
CPI |
CDMP: Identification of Tsunami and Storm surge vulnerable schools, emergency response and control buildings and evaluation of their adaptation capacity |
CDMP |
2007 - 2009 |
National |
Completed |
864 |
CPI |
Oil Spill Modelling |
CAIRN |
2007 - 2008 |
National |
Completed |
865 |
CPI |
Impact Assessment of Climate Change and Sea Level Rise on Monsoon Flooding |
Department of Environment |
2007 - 2008 |
National |
Completed |
866 |
IGW |
Installation of DTW Project Barind II |
N/A |
2007 - 2010 |
National |
Completed |
867 |
WSU |
Study on Well Field Construction for Immediate Supplement to City Water Supply From Nearby Ground water Sources |
Dhaka Water Supply and Sewerage Authority |
2007 - 2009 |
National |
Completed |
868 |
RME |
Study the causes of depression of West Guide bundh Slope of Jamuna Bridge |
Dhaka |
2007 - 2007 |
National |
Completed |
869 |
SDT |
Data Collection for Physical Scale Model Study Under STIFPP (Phase-II) |
SMEC |
2007 - 2007 |
National |
Completed |
870 |
RME |
Three Bridges at Khepupara, Hajipur and Mohipur respectively on the rivers Andhar Manik, Sonatola and Khaprabhanga Hydro-Morphological Study |
Good |
2007 - 2008 |
National |
Completed |
871 |
SDT |
Survey for CAD-II |
Dhaka |
2007 - 2008 |
National |
Completed |
872 |
FRM |
STIFPP-Phase-II Flood Management of 3 Districts |
SMEC |
2007 - 2007 |
National |
Completed |
873 |
CPI |
Integrated Planning for Sustainable Water Resources Management |
IPSWAM |
2007 - 2008 |
National |
Completed |
874 |
CPI |
Integrated Planning for Sustainable Water Resources Management (Dummy) |
IPSWAM |
2007 - 2008 |
National |
Completed |
875 |
WSU |
Analytical Framework (Strengthening of WARPO) |
WARPO |
2007 - 2009 |
National |
Completed |
876 |
WSU |
Model run with a number of withdrawal scenarios in Lakhya river |
EPC |
2007 - 2007 |
National |
Completed |
877 |
FRM |
Dhaka-Chittagong 4 Lane Expressway Hydrological Modelling Study |
SNC-Lavalin Int. |
2007 - 2008 |
National |
Completed |
878 |
CPI |
Bhola Town Protection 2nd Phase |
Bangladesh Water Development Board |
2007 - 2008 |
National |
Completed |
879 |
SDT |
G-K Intake Channel Survey |
Dhaka |
2007 - 2008 |
National |
Completed |
880 |
FRM |
Modhumati Town flood analysis. |
Metro Makers and Developers |
2007 - 2007 |
National |
Completed |
881 |
ED |
WWAP: Assistance to DHI |
Danish Hydraulic Institute |
2007 - 2009 |
National |
Completed |
882 |
CPI |
Land Reclamation Feasibility study of Bay of Bengal |
Bangladesh Water Development Board |
2007 - 2009 |
National |
Completed |
883 |
RME |
Gaibandha Erosion Protection Hydraulic Modelling Study |
Bangladesh Water Development Board |
2007 - 2008 |
National |
Completed |
884 |
WSU |
Establishment of Groundwater Monitoring System in Dhaka City for Aquifer Systems and DWASA production wells. |
Dhaka Water Supply and Sewerage Authority |
2007 - 2009 |
National |
Completed |
885 |
SDT |
NIKO Feni Gas Pipe Line Alignment survey |
Niko Resources Bangladesh Limited |
2007 - 2007 |
National |
Completed |
886 |
WSU |
Indian River Link |
WARPO |
2007 - 2009 |
National |
Completed |
887 |
WSU |
Khulna Water Supply Project |
Dhaka |
2007 - 2007 |
National |
Completed |
888 |
RME |
Balipara Bridge: Hydrological and Morphological Study at 14th km of Trishal-Nandail-Tarail Road on the Old Brahmaputra River |
Good |
2007 - 2007 |
National |
Completed |
889 |
SDT |
STIFPP-II Survey |
SMEC |
2007 - 2007 |
National |
Completed |
890 |
WSU |
Saidabad WTP Limited WQ monitoring with BUET |
BUET |
2007 - 2007 |
National |
Completed |
891 |
IGW |
Kurigram Irrigation Project (South Unit) |
Bangladesh Water Development Board |
2007 - 2009 |
National |
Completed |
892 |
IGW |
Kurigram Irrigation Project (North Unit) |
Bangladesh Water Development Board |
2007 - 2009 |
National |
Completed |
893 |
RME |
Katakhali Bridge RTW design on Karatoya-Bengali: Hydraulic Modelling Study. |
Good |
2006 - 2007 |
National |
Completed |
894 |
SDT |
Jhil Mil Project Topographic Survey |
Basic Dredging Co. Ltd. |
2006 - 2007 |
National |
Completed |
895 |
CPI |
Malaysia: Hydraulic study for mamgrove plantation on the coast of Melacca strait |
NAHRIM |
2006 - 2007 |
National |
Completed |
896 |
CPI |
Narayangonj Power Plant Hydraulic Modelling Study for proposed 360MW Combined Cycle |
Power Development Board |
2006 - 2007 |
National |
Completed |
897 |
CPI |
Sea-Level rise on Coastal communities and their Livelihood, in Bangladesh |
- N/A - |
2006 - 2007 |
National |
Completed |
898 |
CPI |
Pre-feasibilty Study for construction of River Harbour at KAFCO near the outfall of the Karnaphuli River |
Kafco |
2006 - 2007 |
National |
Completed |
899 |
ICT |
Development of WatSan Database Application for NGO Forum |
NGO Forum |
2006 - 2007 |
National |
Completed |
900 |
CPI |
Hydraulic Study of Langkawi Island-Ext-06 |
- N/A - |
2006 - 2006 |
National |
Completed |
901 |
SDT |
Survey for Basic Dredging Co. Ltd for Private Sea Port development at Chittagong |
None |
2006 - 2007 |
National |
Completed |
902 |
CPI |
Monitoring Effects of East Beel Khuksia TRM Basin and Dredging of Hari River for Drainage Improvement of Bhabadaha Area |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
903 |
CPI |
Meghna Power Plant Hydraulic Modelling Study |
Danish Hydraulic Institute |
2006 - 2006 |
National |
Completed |
904 |
RME |
Elasin Bridge RTW |
Good |
2006 - 2007 |
National |
Completed |
905 |
FRM |
WFP: Flood Innundation Maps for Highly Vulnerable Areas in Bangladesh |
World Food Programme |
2006 - 2006 |
National |
Completed |
906 |
RME |
Chatmohor Handial Hamkuria Road,Pabna |
Good |
2006 - 2007 |
National |
Completed |
907 |
FRM |
Flood Response Project. |
Asian Development Bank |
2006 - 2006 |
National |
Completed |
908 |
RME |
Chatmohar Handial Hamkuria Road-Pabna (Dummy) |
Good |
2006 - 2006 |
National |
Completed |
909 |
WSU |
Dhaka Environmental Pollution Study |
The World Bank |
2006 - 2007 |
National |
Completed |
910 |
IGW |
Tubewell Spacing Study |
N/A |
2006 - 2007 |
National |
Completed |
911 |
FRM |
Climate /Flood Forecast Applications for water related disaster mitigation in Bangladesh |
Care Bangladesh |
2006 - 2009 |
National |
Completed |
912 |
SDT |
NIKO Chatak Gas Pipe Line Alignment Survey |
Niko Resources Bangladesh Limited |
2006 - 2006 |
National |
Completed |
913 |
WSU |
Balu River,Lakhya River and DND Khal Water Quality Monitoring Assessment |
SWECO |
2006 - 2006 |
National |
Completed |
914 |
FRM |
FFWC(DHI) Advance Modelling Support. |
Danish Hydraulic Institute |
2006 - 2007 |
National |
Completed |
915 |
RME |
Hassail-Garurgao Protection against Padma erosion FS |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
916 |
CPI |
Protection Work in Coastal Embankment Project Polder 30 |
Bangladesh Water Development Board |
2006 - 2006 |
National |
Completed |
917 |
FRM |
Nagpur-Chouhali Jamuna Dhaleswary Flood Erosion Protection Project. |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
918 |
CPI |
Nijhum Dwip Cross Dam |
Bangladesh Water Development Board |
2006 - 2006 |
National |
Completed |
919 |
RME |
Teesta Barrage to Chandimari Teesta River Left Bank Protection Mathematical Modelling Study. |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
920 |
CPI |
SMEC: Impact assessment of dredging and port for transport of coal from Khulna to Bay of Bengal. |
SMEC |
2006 - 2006 |
National |
Completed |
921 |
FRM |
Hydraulic Study of Rayer Mohal |
DPM Consultant Limited |
2006 - 2006 |
National |
Completed |
922 |
RME |
Horindhara-Ulia Bank Protection at left bank of Jamuna |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
923 |
WSU |
Dhaka Water Supply Project |
CarlBro |
2005 - 2006 |
National |
Completed |
924 |
WSU |
FMG-Chalam Beel Area Feasibility Study |
- N/A - |
2005 - 2007 |
National |
Completed |
925 |
WSU |
IRM- Chlan Beel Area Feasibility Study |
- N/A - |
2005 - 2007 |
National |
Completed |
926 |
WSU |
Feasibility Study of Integrated Water Resources Management of Chalan Beel Area |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
927 |
RME |
Godagari Bank Protection Work Design |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
928 |
RME |
Char Badrashan Protection Work:Feasibility(pc-11) |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
929 |
RME |
Chilmari Town protection Project |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
930 |
CPI |
Hari River dredging, assessment and monitoring |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
931 |
CPI |
Malaysian Sungai Langat Navigation Hydraulics Study. |
- N/A - |
2005 - 2007 |
National |
Completed |
932 |
FRM |
Karatoya River Navigation Improvement Project |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
933 |
RME |
Char Badrashan Protection: Detailed Feasibility SIA&EIA(0&M) |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
934 |
SDT |
Shibsha River upto Chalna Port Survey for Navigability |
Dhaka |
2005 - 2005 |
National |
Completed |
935 |
RME |
Hydraulic Modelling Study for Bridge on Surma River at Kanairghat |
Local Government Engineering Department |
2005 - 2006 |
National |
Completed |
936 |
SDT |
TATA Steel: Survey for Ful Bari Coal Mining Project. |
TATA Steel India |
2005 - 2005 |
National |
Completed |
937 |
CPI |
TATA Urea_Ammonia Plant in Bangladesh:Water Modelling Study. |
TATA Steel India |
2005 - 2005 |
National |
Completed |
938 |
FRM |
Dhaka Integrated Flood Protection Project |
Sir Willium Halcrow & Partners |
2005 - 2006 |
National |
Completed |
939 |
FRM |
Technical backstopping for FFWC Super Model. |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
940 |
RME |
0506 RBB (B1B2) Monitoring |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
941 |
RME |
Hydro Morphological Study for Zia Nagar Bridge for Baleshwar River |
Good |
2005 - 2005 |
National |
Completed |
942 |
CPI |
Monitoring the Impact of protective works at Tazumuddin Upazila |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
943 |
RME |
Joysing Bridge Hydraulic Study |
Good |
2005 - 2006 |
National |
Completed |
944 |
CPI |
Morphological Forecast During Monsoon for Monitoring and Disaster Prepardness for Erosion Protection of River Meghna at Chandpur |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
945 |
CPI |
Khulna to Akrampur point Rupsha rivers Navigability Study for Coal mine. |
Dhaka |
2005 - 2005 |
National |
Completed |
946 |
WSU |
Saidabad WTP Intake Relocation |
Dhaka Water Supply and Sewerage Authority |
2005 - 2005 |
National |
Completed |
947 |
SDT |
Niko gas field Survey. |
Niko Resources Bangladesh Limited |
2005 - 2005 |
National |
Completed |
948 |
WSU |
Drainage Study for Dhaka Cantonment. |
Dhaka Water Supply and Sewerage Authority |
2005 - 2005 |
National |
Completed |
949 |
RME |
Hydraulic Design of Bridge on Ichamoti river and Hydrological assessment of proposed road alignment with cross-drainage route |
Good |
2005 - 2005 |
National |
Completed |
950 |
CPI |
Monitoring the Performance of Beel Kedaria TRM and baseline study for Beel Kukshia |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
951 |
IGW |
GW Resources & Hydro-Geological Investigation at Khulna City |
Local Government Engineering Department |
2005 - 2005 |
National |
Completed |
952 |
CPI |
Impact of Sea Level rise on Land use in the Coastal area . |
CEGIS |
2005 - 2006 |
National |
Completed |
953 |
FRM |
Buri Titas FCDI Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
954 |
RME |
0405 RBPP of B1 and B2 |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
955 |
RME |
Babupur-IndoBangla Protection at Panka_Narayanpur FS |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
956 |
WSU |
Study on Drainage Master Plan for Dhaka City. |
Dhaka Water Supply and Sewerage Authority |
2005 - 2005 |
National |
Completed |
957 |
FRM |
Updating the FS of Upper Surma Kushiyara Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
958 |
FRM |
Updating the FS of Mahuri-Kahua FCDI Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
959 |
FRM |
Modelling support to Feasibility Study for North Rajshahi Irrigation Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
960 |
IGW |
Modelling support to Feasibility Study for South Kurigram Irrigation Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
961 |
IGW |
Modelling support to Feasibility Study for North Kurigram Irrigation Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
962 |
IGW |
Modelling support to Feasibility Study for TCAD,P-II |
DPM Consultant Limited |
2005 - 2005 |
National |
Completed |
963 |
CPI |
Johor: Siltation study on tidal control gates |
Dhaka |
2005 - 2005 |
National |
Completed |
964 |
FRM |
Mathematical Modelling Study for Kaliajuri FCD project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
965 |
RME |
Hydrologic Study for Proposed Road in Doara Bazer in Sunamgonj. |
Niko Resources Bangladesh Limited |
2004 - 2005 |
National |
Completed |
966 |
SDT |
Niko Gas Pipe Line Alignment Survey,Chatak,Shunamgonj |
Niko Resources Bangladesh Limited |
2004 - 2005 |
National |
Completed |
967 |
CPI |
Impact Assesment for Climate Change |
Dhaka |
2004 - 2005 |
National |
Completed |
968 |
WSU |
DWASA Resource Assessment |
Dhaka Water Supply and Sewerage Authority |
2004 - 2006 |
National |
Completed |
969 |
WSU |
GIS, MIS Network Analysis |
Dhaka Water Supply and Sewerage Authority |
2004 - 2006 |
National |
Completed |
970 |
IGW |
Resource assessment and monitoring of DWASA |
Dhaka Water Supply and Sewerage Authority |
2004 - 2007 |
National |
Completed |
971 |
ICT |
Web Page for Dhaka WASA |
Dhaka Water Supply and Sewerage Authority |
2004 - 2005 |
National |
Completed |
972 |
FRM |
Surface Water Hydro and Modelling Fulbari coal mine development Project |
SMEC |
2004 - 2004 |
National |
Completed |
973 |
RME |
Hydraulict study of Badherhat-Khairchar road Project |
- N/A - |
2004 - 2007 |
National |
Completed |
974 |
CPI |
Training In MIKE 21 Software for Taidal Prediction and Analysis to Bangladesh Navy |
Danish Hydraulic Institute |
2004 - 2005 |
National |
Completed |
975 |
FRM |
Rehabilitation of existing haors in northeast region |
Bangladesh Water Development Board |
2004 - 2006 |
National |
Completed |
976 |
IGW |
Groundwater Management Study of Barind Project |
N/A |
2004 - 2006 |
National |
Completed |
977 |
RME |
Titporol & Debdanga Bankprotection modelling |
Bangladesh Water Development Board |
2004 - 2006 |
National |
Completed |
978 |
SDT |
Survey for Erosion Management at Chandpur |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
979 |
RME |
RBP system for UNOCAL on Kushiyara River. |
None |
2004 - 2005 |
National |
Completed |
980 |
SDT |
Survey component of 7 high risk polder |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
981 |
CPI |
Bank Protection of Meghna and Tentulia River(Daulatkhan) |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
982 |
CPI |
Tenjang Ketapang coastal |
Dhaka |
2004 - 2004 |
National |
Completed |
983 |
SDT |
Survey for Padma Bridge Modelling |
Dhaka |
2004 - 2004 |
National |
Completed |
984 |
CPI |
Rehabilitation of High Risk Coastal Polder |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
985 |
RME |
0304 RBPP (B1B2) Monitoring |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
986 |
RME |
Hydraulic modelling for Baradaha Bridge (Gobindaganj) |
- N/A - |
2004 - 2004 |
National |
Completed |
987 |
CPI |
CLASIC Project |
Natural Environment Research Council |
2004 - 2005 |
National |
Completed |
988 |
CPI |
Bhola Island Protection (Tajumuddin) |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
989 |
RME |
0203 RBPP (B1B2) Monitoring |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
990 |
CPI |
Chandpur Town Protection |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
991 |
SDT |
Monitoring of TRM under KJDRP area |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
992 |
FRM |
Belai Beel FCDI Project |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
993 |
CPI |
Hydrological Monitoring KJDRP |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
994 |
SDT |
Survey to Support RBPP Monitoring |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
995 |
ICT |
Software development for NGO Forum |
NGO Forum |
2003 - 2005 |
National |
Completed |
996 |
SDT |
Survey at Babupura in the Chapai Nawabganj |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
997 |
SDT |
Survey works for bank protection works at Bhola |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
998 |
SDT |
Development of Navigation Chart for Mongla Port Authority |
Mongla Port Authority |
2003 - 2004 |
National |
Completed |
999 |
RME |
Kapataksha River Re-excavation |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1000 |
SDT |
X-Section Survey for re-excavations of kobadak |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1001 |
SDT |
Rajuk linked Road Project |
- N/A - |
2003 - 2003 |
National |
Completed |
1002 |
SDT |
Survey Component of Morphological Forecast study (Site B1 & B2) |
Bangladesh Water Development Board |
2003 - 2005 |
National |
Completed |
1003 |
SDT |
Monitoring of Completed River training works at Panka narayanpur |
Bangladesh Water Development Board |
2003 - 2003 |
National |
Completed |
1004 |
CPI |
EIA Lankwai Island |
MAB |
2003 - 2004 |
National |
Completed |
1005 |
CPI |
MIKE 21 & LITPACK training to NAHRIM |
NAHRIM |
2003 - 2004 |
National |
Completed |
1006 |
ICT |
Map and Data Sale |
- N/A - |
2003 - 2010 |
National |
Completed |
1007 |
RME |
Morphological study for erosion prediction and mitigative measures at the viciniy of the Jamuna Bridge and structural measures against possible unification of the Jamuna and Bangali River |
JMBA |
2003 - 2005 |
National |
Completed |
1008 |
SDT |
Survey for JMB Forecast and Jamuna-Bangali Unification Study |
JMBA |
2003 - 2005 |
National |
Completed |
1009 |
SDT |
Survey Component of Groundwater Management and Zoning Study of NBDTW in Greater Dinajpur District |
Bangladesh Water Development Board |
2003 - 2005 |
National |
Completed |
1010 |
SDT |
Survey for Dewanganj Road Bridge Project |
Local Government Engineering Department |
2003 - 2003 |
National |
Completed |
1011 |
SDT |
Survey for Chandpur Comilla Integrated FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1012 |
IGW |
Groundwater Management and Zoning Study for Repair & Rehabilitation of DTW Project in Greater Dinajpur District |
Bangladesh Water Development Board |
2003 - 2006 |
National |
Completed |
1013 |
SDT |
Topographic Survey & Mapping of Uttara Res. Model Town (3rd Phase) of RAJUK |
- N/A - |
2003 - 2003 |
National |
Completed |
1014 |
FRM |
Mathematical Modelling for Feasibility Study of Chandpur-Comilla FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1015 |
FRM |
Dry season flow augmentation of Buriganga river |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1016 |
RME |
Hydraulic mathematical modelling including morphological prediction of Brahmaputra river in connection with the design of the proposed bridge over the Old Brahmaputra under thana Dewanganj, Dist, Jama |
Local Government Engineering Department |
2003 - 2003 |
National |
Completed |
1017 |
SDT |
Survey works of feasibility study for improvement of Navigability of Mongla Port |
Mongla Port Authority |
2003 - 2003 |
National |
Completed |
1018 |
CPI |
Feasibility study for improvement of navigability of Mongla Port |
Mongla Port Authority |
2003 - 2004 |
National |
Completed |
1019 |
FRM |
Arial Beel FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1020 |
FRM |
Jamuna-Padma Left Bank Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1021 |
FRM |
Zia Nagar Hularhat FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
1022 |
SDT |
On line guidance of dredging works and Interim Survey of Southern Anchorage |
- N/A - |
2002 - 2004 |
National |
Completed |
1023 |
RME |
Monitoring of Panka_Narayanpur RTW |
Bangladesh Water Development Board |
2002 - 2003 |
National |
Completed |
1024 |
SDT |
Survey for Elasin Bridge Project |
- N/A - |
2002 - 2003 |
National |
Completed |
1025 |
RME |
Hydrological and Hydro-morphological study of the Dhaleswary River in connection |
- N/A - |
2002 - 2003 |
National |
Completed |
1026 |
IGW |
Feasibility and Model Study for Rehabilitation of Flood Control Embankment on Both Banks of Gumti |
Bangladesh Water Development Board |
2002 - 2004 |
National |
Completed |
1027 |
SDT |
Survey Component of Flood Management in Gumuti River |
Bangladesh Water Development Board |
2002 - 2003 |
National |
Completed |
1028 |
RME |
Capacity Building in the Field of Water Resources Engineering and Management in Bangladesh: Experimental Research on the Effect of Bottom Vanes on River |
Bangladesh Water Development Board |
2001 - 2005 |
National |
Completed |
1029 |
FRM |
Updating and Validation of General Model & Six Regional Models |
Bangladesh Water Development Board |
2001 - 2005 |
National |
Completed |
1030 |
CPI |
Hydraulic Modelling Study For 2nd CERP |
Bangladesh Water Development Board |
2001 - 2002 |
National |
Completed |
1031 |
FRM |
Consolidation and Strengthening of Flood Forecasting and Warning Services |
Danish Hydraulic Institute |
2000 - 2005 |
National |
Completed |
1032 |
HRD |
Training. on State-of-the Art Tec. for Water & Env. M |
- N/A - |
2000 - 2010 |
National |
Completed |
1033 |
IGW |
Command Area Development Project of Teesta Barrage Project (Phase 1) |
Bangladesh Water Development Board |
1999 - 2004 |
National |
Completed |
1034 |
FRM |
Expansion flood forecasting model & Improve inundation model in coastal and hotspot areas |
Bangladesh Water Development Board |
1995 - 1996 |
National |
Completed |
1035 |
FRM |
Data Collection and Regional Model Validation for 2020 |
- N/A - |
1995 - 1996 |
National |
Completed |