Academic Chronology

Mr. Tanbir completed his graduation in Civil Engineering from DUET, Gazipur in January 2012 and Master of Engineering in Water Resources Engineering from BUET in June 2026.

Professional Track Record

Mr. Tanbir has been serving in the Survey and Data Division of IWM since October 2015. Prior to joining IWM, he worked as a Project Engineer in a construction firm. He possesses strong expertise in hydrological and meteorological data analysis, particularly for water balance studies, dependable flow analysis, exploitable flow calculation, and preparation of surface water resources potential maps. In addition, he has extensive experience in assessing dredging requirements, as well as conducting pre- and post-dredging volume calculations for rivers and canals."

Training/Membership/Workshop/Seminar/Publication etc.

Member (M/35674), The Institute of Engineers (IEB), Bangladesh.

Training Received

  1. Training on Urban Track, Inland Track and Marine Track, conducted by Danish Hydraulic Institute (DHI) through online in September 2022.
  2. Training on Computational Hydraulics, Hydrology and Hydraulics and Statistics for Water Management, conducted by BUET in February 2022.
  3. Introduction to Computer Aided Analysis and Design of Civil Engineering Structures Using ETABS and SAFE Software, Conducted by Engineering Staff College, Bangladesh in October 2021.
  4. Training on Bathymetric Survey by using HYPACK Software and RTK GPS, Conducted by Institute of Water Modelling in April 2017.
  5. Training on Bathymetric Survey by using HYDROPRO Software and RTK GPS, Conducted by Institute of Water Modelling in August 2016.
  6. Basic Training on Arc GIS, Conducted by Institute of Water Modelling in December 2015.

Major Project Assignment

  1. Input as Hydrologist in the Project for Improvement of Management Capacity of DPHE on Water Supply, (August 2022 to June 2026); Client: JICA
  2. Input as Hydrologist for the project for Data Collection Survey for Water Resources Development in the South Chattogram Water Resources Development Project, (January 2020 to December 2021); Client: JICA
  3. Implementation Support Consultancy Services for Kalni-Kushiyara River Management Project by using Mathematical Modelling and State-of-the-Art Survey Technique, (December 2015- December, 2020); Client: Bangladesh Water Development Board.
  4. Land and Hydrological Survey for Forecast Based Finance (FbF) Project, (December, 2015 to January, 2016); Client: German Red Cross.
  5. Assessment of Dredging Requirements for Khaliajuri Link Channel and Branch of Old Surma Rivers and Estimation of the Dredging Volume, (February, 2016 to March, 2016); Client: Local Government Engineering Department, Bangladesh.
  6. Study for Dhaka Eastern Bypass Project, (April, 2016 to October, 2016); Client: Bangladesh Water Development Board
  7. Topographic and Bathymetric Survey for Feasibility Study for Development of Power Plant based Port and Harbour facilities at Maheskhali, Bangladesh, (October, 2015 to December, 2015); Client: Steag Energy Services (India) Pvt. Ltd.