Project No | Project Name |
---|---|
51286 | Morphological Study for the Selected Offtake in Connection with the Buriganga Augmentation Project |
51430 | Monitoring of Hydraulic and Morphological Conditions of Jamuna River for the Safety of the RTW of Bangabandhu Bridge during the year 2013-2017 |
51673 | Morphological Mathematical Modelling for Implementation Support to Maintenance Dredging of the Gorai River for Three Years (2014-16) under Gorai River Restoration Project, Phase II |
51714 | Gumti River Dredging - Hydro-morphological Study |
51794 | Feasibility Study of Re-excavation of the Bhairab River flowing over Meherpur and Chuadanga Districts |
Project No | Project Name |
---|---|
P-51724 | Study for Upgrading and Rehabilitation of Karnafuli and other Irrigation Projects with ESIA in Hathazari, RauzanRangunia, Boalkhali and FatikchariUpazillas in Chittagong District. |
P-51690 | Detailed Feasibility Study with ESIA for Restoration of Water Resources around Baral River Basin under Rajshahi & Natore Districts |
P-51703 | Cropping System Intensification in the salt affected Coasted Coastal Zones of Bangladesh and West Bengal |
P-51713 | Study for Investigation of Groundwater and Surface water irrigation in Habiganj, Maulvibazar, Sylhet, Sunamganj, Netrokona and Kishoregonj Districts |
Project No | Project Name |
---|---|
51516 | Formulation of Bangladesh Delta Plan 2100 |
51512 | Carryout Morphological Study, Mathematical Model Study, Design & Supervision and EIA/SIA of the 12 Navigation Routes |
51621 | BanD-Aid: Bangladesh Coastal Vulnerability and Sea Level Rise Hazards |
51669 | Improving Adaptation against coastal vulnerability and enhancing flood forecasting skill through a satellite data integrating modelling framework in changing climate |
51650 | Community water management for improved food security, nutrition and livelihoods in the polders of the coastal zone of Bangladesh |
51566 | Coastal Embankment Improvement Project -I |
51712 | Monitoring of Sedimentation, Salinity, Tide & Flood in Kobadak River System & TRM Basin |
51852 | Techno-Economical Feasibility Study for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
51871 | Techno-Economical Feasibility Study for Development of The Land at Payra Port by Dredging Chars, Shoals For Oil Refinery |
51851 | Feasibility Study and Detailed Engineering Design for Long Term Solution of Drainage Problems in the Bhabodah Area (2nd Phase) |
51894 | Monitoring the Performance of Dredging i/c Hydrological and Morphological Impact by Modelling and Effectiveness of Dredging |
51885 | Research on Assessment of effectiveness of Mangrove Forests for Coastal Protection against Cyclonic Storm Surge: Bangladesh |
51901 | WaterApp for Water Resources Management in polder 43/2B and Polder 31-part |
51884 | Feasibility Study for Improvement and Restoration of Navigability for Seven Navigation Routes |
51880 | Hydrological and Morphological Study for Extension of Cox’s Bazar Airport |
51881 | Environmental and Social Impact Assessment Study for Extension of Cox’s Bazar Airport |
Project No | Project Name |
---|---|
51238 | Drainage and Irrigation Improvement Study of BeelGazna and Adjoining Areas of Pabna District (Design of irrigation structures) (Client: BWDB) |
51379 | Kalni-Kushiyara Dredging Modelling & Monitoring |
51521 | Flash Flood forecasting & Dissemination (Client: FFWC, BWDB) |
51523 | EU-Global Earth Observation for Integrated Water Resources Assessment (EartH2Observe) (Client: European Union) |
51602 | Mathematical Modelling and Topographic Survey for Haor Flood Management of JICA (Client: Nippon Koei Co Ltd.) |
51629 | Improvement of FFWC Flood Forecasting Model to enable the existing Flood Model to take input from the mobile SMS instead of manual key board input (Client: Islamic Relief, Bangladesh) |
51720 | Regional Training Program for Scaling up of Satellite assisted FF Systems in South and Southeast Asian Nations (Client: NAS-USAID) |
51733 | Flood Hydrology Study of the Eastern Part of Dhaka Metropolitan Area (Client: RAJUK) |
51770 | Flood Hazard Model and Index based Flood Insurance for South Asia with IWMI (Client: IWMI) |
10529 | Data Collection and Updating of General & Regional Models |
51453 | Hydrological study of Tipaimukh project (Client: Joint Rivers Commission Bangladesh) |
51751 | Hydro-morphological Study of the Ghorautra River (Sub-project REN) |
Project No | Project Name |
---|---|
51401 | Dredging of Surma-Baulai River System Improvement of existing Embkt& Drainage Channel by Using Math Model & State -of-the Art Survey Technique | 51721 | Consultancy services for Quality Control of Protective Work of Cross Bars as per design and specification |
51735 | Bathymetric Survey for Gorai River Restoration Project from 2014-2017 |
51803 | Services for Review of the Physical Condition and Functionality of Existing Hydraulic Structures of BWDB |
Project No | Project Name |
---|---|
51526 | Padma (Jashaldia) Water Treatment Plant Project |
51800 | Drainage Study of Goranchatbari and Kalyanpur Catchments |
51462 | Bangladesh Rural Water Supply & Sanitation Project |
51465 | Consultancy services for Network Analysis in Chittagong City |
51596 | Consulting Services for Preparation and Implementation of the Resettlement Action Plan for Padma (Jashaldia) Water Treatment Plant |
51665 | Joint Research - Lancaster University |
51726 | Preparation of a Sanitation and Drainage Improvement Strategy and Master Plan for the city of Chittagong |
51740 | Contract Package 2.7 of DESWSP - RFL |
51637 | Study on Artificial Recharge to Aquifer by Rainwater Harvesting from Building Roof - Tops in Dhaka City |
51638 | Establishment of Groundwater Monitoring system in Dhaka City for Aquifer System and DWASA Production Wells |
51784 | Feasibility Study for Mitigation of Drainage Congestion & Water Logging in Sylhet Metropolitan Area including ESIA |
51785 | Technical Study of Flood Control and Drainage Development at Dhaka Circular Road (Dhaka Eastern Bypass) Project |
51813 | Feasibility and EIA Study for Immediate Replacement and Rehabilitation of Sewer Lines Under Pagla Catchment Based on Sewerage Master Plan Study for Dhaka City |
51860 | Feasibility Study with Detail Design of Surface Water Treatment Plant for Sylhet City Corporation |
51906 | Design of Water Line Considering DMA Concept at A-Block of Uttara Apartment Project |
51902 | Feasibility & SEIA Study for Expansion of Drainage Networks & Development of Canals in Dhaka City |
Project No | Project Name |
---|---|
51695 | Updating and upgrading of SIMS, development of SIMS-Google,SIMS-WEB, SIMS-Mobile |
51959 | Sub-project of P-51713 - Development of IIS & GIS Mapping work for DBHWD's Haor project |
51941 | Development of Web-GIS Application Phase-II for BTRC |
51769 | Sub Project of Kobadak Monitoring Project (P-51712) |
40863 | Updating the system of accounting |